Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
University of Michigan Ann Arbor
Work includes replacing perimeter heat and ac units.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Yuma County Library District
Rooftop-Mounted Packaged Air Conditioning Units: Selected contractor will remove and transport to County’s designated storage area seven (7) rooftop-mounted packaged air conditioning units, and provide and install seven (7) new rooftop-mounted packaged air conditioning units with accessories as shown on plans. Zone Damper Controllers: Selected contractor will remove and transport to County’s designated storage area the existing controls in each existing zone damper, and provide and install new controls at each existing zone damper. The new controls will include actuator and airflow measurement or velocity sensor to allow for pressure-independent control. Exhaust Fans: Selected contractor will remove and transport to County’s designated storage area two (2) rooftop-mounted exhaust fans and install two (2) new rooftop-mounted downblast exhaust fans with accessories as shown on plans. Split-System: Selected contractor will remove and transport to County’s designated storage area nine (9) Split System AC units, and provide and install a variable refrigerant flow (VRF) system comprised of twelve indoor fan coil units and five outdoor condensing units. The new system will also include one new intake fan. Units are to either be heat pumps, or come equipped with electric heat strips. Contractor to provide/install curb adaptors as necessary. Convenience outlets and non-fused disconnects to be provided at each unit. Contractor to make all necessary electrical connections (460 volt/3 phase) to each unit.
Posted Date
Oct 30, 2025
Due Date
Nov 21, 2025
Release: Oct 30, 2025
Yuma County Library District
Close: Nov 21, 2025
Rooftop-Mounted Packaged Air Conditioning Units: Selected contractor will remove and transport to County’s designated storage area seven (7) rooftop-mounted packaged air conditioning units, and provide and install seven (7) new rooftop-mounted packaged air conditioning units with accessories as shown on plans. Zone Damper Controllers: Selected contractor will remove and transport to County’s designated storage area the existing controls in each existing zone damper, and provide and install new controls at each existing zone damper. The new controls will include actuator and airflow measurement or velocity sensor to allow for pressure-independent control. Exhaust Fans: Selected contractor will remove and transport to County’s designated storage area two (2) rooftop-mounted exhaust fans and install two (2) new rooftop-mounted downblast exhaust fans with accessories as shown on plans. Split-System: Selected contractor will remove and transport to County’s designated storage area nine (9) Split System AC units, and provide and install a variable refrigerant flow (VRF) system comprised of twelve indoor fan coil units and five outdoor condensing units. The new system will also include one new intake fan. Units are to either be heat pumps, or come equipped with electric heat strips. Contractor to provide/install curb adaptors as necessary. Convenience outlets and non-fused disconnects to be provided at each unit. Contractor to make all necessary electrical connections (460 volt/3 phase) to each unit.
California Department of Transportation
Replace culverts, cold plane AC pavement and overlay with HMA.
Posted Date
Oct 6, 2025
Due Date
Dec 3, 2025
Release: Oct 6, 2025
California Department of Transportation
Close: Dec 3, 2025
Replace culverts, cold plane AC pavement and overlay with HMA.
AvailableIllinois Capital Development Board
Work includes to replace air handling units.
Posted Date
-
Due Date
Nov 25, 2025
Illinois Capital Development Board
Close: Nov 25, 2025
Work includes to replace air handling units.
AvailablePlant Protection and Quarantine (PPQ)
Purchase and deliver complete Trane (or equal) split-system heat pump units as indicated on the attached equipment cutsheets. Purchase of Five (5) matched split-systems Air Handling Units (AHU-1 through AHU-5) and Heat Pump Condensers (HP-1 through HP-5), and One (1) larger-capacity Air Handling Unit and Heat Pump (AHU-6 / HP-6) for the Building 6101 NWS Renovation Project.
Posted Date
Nov 18, 2025
Due Date
Nov 24, 2025
Release: Nov 18, 2025
Plant Protection and Quarantine (PPQ)
Close: Nov 24, 2025
Purchase and deliver complete Trane (or equal) split-system heat pump units as indicated on the attached equipment cutsheets. Purchase of Five (5) matched split-systems Air Handling Units (AHU-1 through AHU-5) and Heat Pump Condensers (HP-1 through HP-5), and One (1) larger-capacity Air Handling Unit and Heat Pump (AHU-6 / HP-6) for the Building 6101 NWS Renovation Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis