Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Los Alamos County
Project will connect four (4) water production wells and 4 water booster stations through a fiber optic loop to the supervisory controls and data acquisition (SCADA) control center. Work include installation of approx. four and a half (4.5) miles of aerial fiber optic lines, including the installation, splicing, testing, and landing of these cables inside of the well houses and booster stations. Three (3) underground fiber optic boxes will also be required, along with associated excavation and approximately 100' of new 4" SCH-40 PVC underground conduit will be installed. Miscellaneous work includes the installation of 8' - 35' wooden poles and general site cleanup.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Fairfield
Work include 2,696' install one (1) 2" conduit; 4,120' install tracer wire in conduit; 11 EA install handhold; 6 EA install route marker posts; 6,964' fiber optic cable, as per plan (underground); 589' fiber optic cable, as per plan (overhead); 11 EA materials hh with lid 24"x36"x30"; 4 EA slack installation; 100' install new conduit (emt up to 2") - interior; 180' bridge attachment (2" ridgid conduit).
Posted Date
Nov 14, 2025
Due Date
Dec 1, 2025
Release: Nov 14, 2025
City of Fairfield
Close: Dec 1, 2025
Work include 2,696' install one (1) 2" conduit; 4,120' install tracer wire in conduit; 11 EA install handhold; 6 EA install route marker posts; 6,964' fiber optic cable, as per plan (underground); 589' fiber optic cable, as per plan (overhead); 11 EA materials hh with lid 24"x36"x30"; 4 EA slack installation; 100' install new conduit (emt up to 2") - interior; 180' bridge attachment (2" ridgid conduit).
AvailableGreater Augusta Utility District
Fiber Optic Switch / Cable Installation and Cable Repair. 1. Install a new 24 strand fiber optic cable through an existing empty 4” diameter, 4,000’ long PVC conduit between the wastewater treatment plant and a structure located near Bridge on the rail trail. 2. Troubleshoot and repair an existing daisy chained fiber optic network located on the Rail Trail between the wastewater treatment plant and Memorial Bridge in Augusta, Maine. The network has failed and needs to be spliced to be repaired.
Posted Date
-
Due Date
Nov 26, 2025
Greater Augusta Utility District
Close: Nov 26, 2025
Fiber Optic Switch / Cable Installation and Cable Repair. 1. Install a new 24 strand fiber optic cable through an existing empty 4” diameter, 4,000’ long PVC conduit between the wastewater treatment plant and a structure located near Bridge on the rail trail. 2. Troubleshoot and repair an existing daisy chained fiber optic network located on the Rail Trail between the wastewater treatment plant and Memorial Bridge in Augusta, Maine. The network has failed and needs to be spliced to be repaired.
Charlotte County
Cabling installation, maintenance, design and support shall consist of many types of products and applications. They may include, but not be limited to: 1. Singlemode fiber optic cable installation outdoors and indoors 2. Multimode fiber optic cable installation outdoors and indoors 3. Termination of SC, LC, and ST type connectors 4. Directional bore installation 5. Open trenching installation 6. Fusion splicing 7. Optical time domain reflectometer (OTDR) testing and certification 8. As-builts
Posted Date
Oct 29, 2025
Due Date
Nov 19, 2025
Release: Oct 29, 2025
Charlotte County
Close: Nov 19, 2025
Cabling installation, maintenance, design and support shall consist of many types of products and applications. They may include, but not be limited to: 1. Singlemode fiber optic cable installation outdoors and indoors 2. Multimode fiber optic cable installation outdoors and indoors 3. Termination of SC, LC, and ST type connectors 4. Directional bore installation 5. Open trenching installation 6. Fusion splicing 7. Optical time domain reflectometer (OTDR) testing and certification 8. As-builts
Silicon Valley Power
The work to be performed on an on-call and as-needed based to the City. Work shall consist of both substructure and aerial fiber optic infrastructure and fiber optic cable throughout the City.
Posted Date
Nov 12, 2025
Due Date
Dec 11, 2025
Release: Nov 12, 2025
Silicon Valley Power
Close: Dec 11, 2025
The work to be performed on an on-call and as-needed based to the City. Work shall consist of both substructure and aerial fiber optic infrastructure and fiber optic cable throughout the City.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis