Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Charlotte County
Cabling installation, maintenance, design and support shall consist of many types of products and applications. They may include, but not be limited to: 1. Singlemode fiber optic cable installation outdoors and indoors 2. Multimode fiber optic cable installation outdoors and indoors 3. Termination of SC, LC, and ST type connectors 4. Directional bore installation 5. Open trenching installation 6. Fusion splicing 7. Optical time domain reflectometer (OTDR) testing and certification 8. As-builts
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Dos Palos-Oro Loma Joint Unified School District
Fiber-optic cabling infrastructure.
Posted Date
Oct 10, 2025
Due Date
Dec 1, 2025
Release: Oct 10, 2025
Dos Palos-Oro Loma Joint Unified School District
Close: Dec 1, 2025
Fiber-optic cabling infrastructure.
AvailableHutchinson County
Multi-site fiber optic infrastructure project involves the installation of new fiber optic laterals for all three sites and the provisioning of new network equipment at each location. The new infrastructure will connect back to the existing network backbone, which terminates.
Posted Date
Oct 27, 2025
Due Date
Nov 20, 2025
Release: Oct 27, 2025
Hutchinson County
Close: Nov 20, 2025
Multi-site fiber optic infrastructure project involves the installation of new fiber optic laterals for all three sites and the provisioning of new network equipment at each location. The new infrastructure will connect back to the existing network backbone, which terminates.
AvailableSilicon Valley Power
The work to be performed on an on-call and as-needed based to the City. Work shall consist of both substructure and aerial fiber optic infrastructure and fiber optic cable throughout the City.
Posted Date
Nov 12, 2025
Due Date
Dec 11, 2025
Release: Nov 12, 2025
Silicon Valley Power
Close: Dec 11, 2025
The work to be performed on an on-call and as-needed based to the City. Work shall consist of both substructure and aerial fiber optic infrastructure and fiber optic cable throughout the City.
AvailablePalm Beach County
Purchase and delivery of fiber optic cable.
Posted Date
Mar 20, 2024
Due Date
Mar 21, 2029
Release: Mar 20, 2024
Palm Beach County
Close: Mar 21, 2029
Purchase and delivery of fiber optic cable.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis