Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
McLean County
500 tons HMA Surface Course Mix "C" N50 HMA Binder Course IL 19.0.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Village of Burnham
Street resurfacing, including HMA surface removal, HMA binder and surface courses, pavement patching, curb and gutter removal and replacement, sidewalk removal and replacement, detectable warnings, drainage structure adjustments, restoration and incidental work to complete the contract.
Posted Date
Nov 20, 2025
Due Date
Dec 2, 2025
Release: Nov 20, 2025
Village of Burnham
Close: Dec 2, 2025
Street resurfacing, including HMA surface removal, HMA binder and surface courses, pavement patching, curb and gutter removal and replacement, sidewalk removal and replacement, detectable warnings, drainage structure adjustments, restoration and incidental work to complete the contract.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Ford County
Project consists of 3/4" HMA leveling course and 2" of HMA surfacing.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Ford County
Close: Dec 19, 2025
Project consists of 3/4" HMA leveling course and 2" of HMA surfacing.
AvailableHarvey County
Project consists of the following: This project consists of 1.75” Hot Mix Asphalt (HMA) overlay on approximately 9.65 miles of road in Harvey County, Kansas. Road widths are generally 24 feet wide. HMA shall be KDOT Commercial Grade Mix (Class A). HMA application shall be with a spray paver for W. Dutch Ave. on both locations (9.65 miles). Approximately 3,498 SY of milling will be required as part of the scope of work, including but not limited to milling transitions at the beginning of the project, end of the project, intersections, and at bridge approaches. Temporary pavement marking is included in this contract, subsidiary to HMA costs, and shall be on the centerline only.
Posted Date
Nov 20, 2025
Due Date
Dec 15, 2025
Release: Nov 20, 2025
Harvey County
Close: Dec 15, 2025
Project consists of the following: This project consists of 1.75” Hot Mix Asphalt (HMA) overlay on approximately 9.65 miles of road in Harvey County, Kansas. Road widths are generally 24 feet wide. HMA shall be KDOT Commercial Grade Mix (Class A). HMA application shall be with a spray paver for W. Dutch Ave. on both locations (9.65 miles). Approximately 3,498 SY of milling will be required as part of the scope of work, including but not limited to milling transitions at the beginning of the project, end of the project, intersections, and at bridge approaches. Temporary pavement marking is included in this contract, subsidiary to HMA costs, and shall be on the centerline only.
AvailableIndiana Department of Transportation
HMA overlay, preventive maintenance. Work includes 79 Ton type C full depth HMA patching; 1,182 Ton type C partial depth HMA patching; 85,742 SY of 1 1/2" asphalt milling; pavement markings; signage. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
HMA overlay, preventive maintenance. Work includes 79 Ton type C full depth HMA patching; 1,182 Ton type C partial depth HMA patching; 85,742 SY of 1 1/2" asphalt milling; pavement markings; signage. See attached files.