Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes irrigation system restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Ground maintenance services, including mowing, trimming and debris removal within the parkway median strip and the planter strip.
Posted Date
Dec 9, 2025
Due Date
Dec 29, 2025
Release: Dec 9, 2025
Close: Dec 29, 2025
Ground maintenance services, including mowing, trimming and debris removal within the parkway median strip and the planter strip.
AvailablePremium
Access the largest public sector contact database
The City of Durham seeks proposals for right-of-way maintenance services, including mowing, trimming, edging, blowing, and litter removal along Martin Luther King Jr. Parkway. The contract term is three years, covering approximately 5.3 miles of roadway and 3.1 miles of median. Contractors must provide all necessary tools, equipment, and materials.
Posted Date
Nov 17, 2025
Due Date
Dec 22, 2025
Release: Nov 17, 2025
Close: Dec 22, 2025
The City of Durham seeks proposals for right-of-way maintenance services, including mowing, trimming, edging, blowing, and litter removal along Martin Luther King Jr. Parkway. The contract term is three years, covering approximately 5.3 miles of roadway and 3.1 miles of median. Contractors must provide all necessary tools, equipment, and materials.
AvailableRestore a total of 6,380 LF of Parkway Creek located along the Capital Area Greenbelt, 6,380 linear feet of restoration planned across all phases, Phase 4 includes approximately 1,744 linear feet of stream restoration. Of the 1,744 linear feet, the project is broken down into 3 sub-phases, Phase 4A, 4B, and 4C. The Phase 4 stream restoration work includes: streambank grading to create floodplain reconnection; installing bank treatments, including boulder packing, to protect existing adjacent park infrastructure and stabilize mature trees; installing riparian plantings along the stream corridor.
Posted Date
Dec 10, 2025
Due Date
Dec 23, 2025
Release: Dec 10, 2025
Close: Dec 23, 2025
Restore a total of 6,380 LF of Parkway Creek located along the Capital Area Greenbelt, 6,380 linear feet of restoration planned across all phases, Phase 4 includes approximately 1,744 linear feet of stream restoration. Of the 1,744 linear feet, the project is broken down into 3 sub-phases, Phase 4A, 4B, and 4C. The Phase 4 stream restoration work includes: streambank grading to create floodplain reconnection; installing bank treatments, including boulder packing, to protect existing adjacent park infrastructure and stabilize mature trees; installing riparian plantings along the stream corridor.
AvailableThe Capital Area Greenbelt Association (CAGA) is soliciting contractors for Parkway Creek Restoration Phase 4, a stream restoration project located in Harrisburg, Dauphin County, Pennsylvania. The work covers approximately 1,744 linear feet across sub-phases 4A–4C and includes streambank grading, bank stabilization (e.g., boulder packing), and riparian plantings to restore floodplain connectivity and protect adjacent park infrastructure and trees. The bid package was posted December 10, 2025 and the submission deadline is listed as January 24, 2026 (see source link for full technical specifications and submission instructions).
Posted Date
Dec 10, 2025
Due Date
Jan 24, 2026
Release: Dec 10, 2025
Close: Jan 24, 2026
The Capital Area Greenbelt Association (CAGA) is soliciting contractors for Parkway Creek Restoration Phase 4, a stream restoration project located in Harrisburg, Dauphin County, Pennsylvania. The work covers approximately 1,744 linear feet across sub-phases 4A–4C and includes streambank grading, bank stabilization (e.g., boulder packing), and riparian plantings to restore floodplain connectivity and protect adjacent park infrastructure and trees. The bid package was posted December 10, 2025 and the submission deadline is listed as January 24, 2026 (see source link for full technical specifications and submission instructions).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis