Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Gainesville
Furnishing all products and performing all labor necessary for the construction of FY2024 Water Main Improvements Project, which consists of approx. 1,145 LF of 12" ductile iron (DIP), 1,167 LF of 8" ductile iron (DIP), and 5,076 LF of 6" ductile iron (DIP) water main, including a 385 LF Free Bore (various sizes), 18 fire hydrants, 23 valves (various sizes), and 96 water service changeovers (various sizes) in multiples locations, and including all other necessary and required appurtenances and erosion and sedimentation control.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Tifton
Construction consists on installing 8,334 L.F. of 8" PVC Water Main and 1,135 LF of 2" PVC Water Main, connection to existing water main via tapping sleeve and valve, erosion control, traffic control, and all associated measures for the complete project.
Posted Date
Nov 25, 2025
Due Date
Jan 8, 2026
Release: Nov 25, 2025
City of Tifton
Close: Jan 8, 2026
Construction consists on installing 8,334 L.F. of 8" PVC Water Main and 1,135 LF of 2" PVC Water Main, connection to existing water main via tapping sleeve and valve, erosion control, traffic control, and all associated measures for the complete project.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Trumbull County
Engineering services in connection with the stillwagon road water improvements project.
Posted Date
Nov 27, 2025
Due Date
Jan 9, 2026
Release: Nov 27, 2025
Trumbull County
Close: Jan 9, 2026
Engineering services in connection with the stillwagon road water improvements project.
AvailableVillage of Oak Brook
construction of approximately 12,000 LF of open cut water main of various sizes (8"-12" in diameter), approximately 2,400 LF of horizontal drilling of 12” water main, and 3,350 LF of storm sewer of various sizes (10”-48”), 500 LF of water main lining, water service connections, pavement patching, landscape restoration and all other incidental work.
Posted Date
Nov 18, 2025
Due Date
Dec 4, 2025
Release: Nov 18, 2025
Village of Oak Brook
Close: Dec 4, 2025
construction of approximately 12,000 LF of open cut water main of various sizes (8"-12" in diameter), approximately 2,400 LF of horizontal drilling of 12” water main, and 3,350 LF of storm sewer of various sizes (10”-48”), 500 LF of water main lining, water service connections, pavement patching, landscape restoration and all other incidental work.
AvailableVillage of Oak Brook
construction of approximately 12,000 LF of open cut water main of various sizes (8"-12" in diameter), approximately 2,400 LF of horizontal drilling of 12” water main, and 3,350 LF of storm sewer of various sizes (10”-48”), 500 LF of water main lining, water service connections, pavement patching, landscape restoration and all other incidental work.
Posted Date
Nov 18, 2025
Due Date
Dec 4, 2025
Release: Nov 18, 2025
Village of Oak Brook
Close: Dec 4, 2025
construction of approximately 12,000 LF of open cut water main of various sizes (8"-12" in diameter), approximately 2,400 LF of horizontal drilling of 12” water main, and 3,350 LF of storm sewer of various sizes (10”-48”), 500 LF of water main lining, water service connections, pavement patching, landscape restoration and all other incidental work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →