Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Bossier City
Conversion for two alternative fuel stations from E85 and CNG fuels to regular unleaded and addition of an above ground tank for diesel fuel. Also included is fencing around properties.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Centennial
The project consists of replacing approx 150 existing streetlight fixtures with LED fixtures. This project will take place in coordination with an existing streetlight conversion project and assets will be updated in the City’s GIS platform to ensure adequate recordkeeping and synchronization between the two field operations teams. Each location already consists of an in-line fuse disconnect plug to be utilized to deenergize the fixture prior to the retrofit taking place EECBG Program- UEI Number F7J1C254S38
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
City of Centennial
Close: Dec 17, 2025
The project consists of replacing approx 150 existing streetlight fixtures with LED fixtures. This project will take place in coordination with an existing streetlight conversion project and assets will be updated in the City’s GIS platform to ensure adequate recordkeeping and synchronization between the two field operations teams. Each location already consists of an in-line fuse disconnect plug to be utilized to deenergize the fixture prior to the retrofit taking place EECBG Program- UEI Number F7J1C254S38
AvailableCity of Alhambra
The City of Alhambra is seeking bids for its Streetlight Conversion Project on various streets. The scope includes replacing existing luminaires with new LED luminaires and installing associated electrical infrastructure such as conduit, conductors, and service cabinets.
Posted Date
Oct 14, 2025
Due Date
Nov 19, 2025
Release: Oct 14, 2025
City of Alhambra
Close: Nov 19, 2025
The City of Alhambra is seeking bids for its Streetlight Conversion Project on various streets. The scope includes replacing existing luminaires with new LED luminaires and installing associated electrical infrastructure such as conduit, conductors, and service cabinets.
AvailableLangham Creek Utility District
The work consists of providing the necessary labor, materials, equipment, supervision, and plant for the construction of the wastewater treatment plant improvements, onsite lift station improvements, and liquid chemical conversion including but not limited to: lift station pump replacement and structural modifications; main process basins piping improvements; liquid chemical feed equipment, piping, CMU building with metal canopy chemical storage area; electrical; controls; demolition items; pavement; site grading and drainage; and site restoration as specified.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Langham Creek Utility District
Close: Dec 17, 2025
The work consists of providing the necessary labor, materials, equipment, supervision, and plant for the construction of the wastewater treatment plant improvements, onsite lift station improvements, and liquid chemical conversion including but not limited to: lift station pump replacement and structural modifications; main process basins piping improvements; liquid chemical feed equipment, piping, CMU building with metal canopy chemical storage area; electrical; controls; demolition items; pavement; site grading and drainage; and site restoration as specified.
AvailableCity of Hallandale Beach
Work includes to demolish the existing submersible wastewater lift station including pumps, wet well top slab, discharge piping, controls, emergency generator system and fuel system, rehabilitation of the existing wet well, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, and fittings, macerator assembly, control system, scada, electrical service, emergency generator with integral fuel tank, fencing, water service, start-up services, training, site restoration, associated roadway and right-of-way restoration, and all other appurtenances necessary for a complete and accepted project.
Posted Date
Oct 30, 2025
Due Date
Dec 15, 2025
Release: Oct 30, 2025
City of Hallandale Beach
Close: Dec 15, 2025
Work includes to demolish the existing submersible wastewater lift station including pumps, wet well top slab, discharge piping, controls, emergency generator system and fuel system, rehabilitation of the existing wet well, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, and fittings, macerator assembly, control system, scada, electrical service, emergency generator with integral fuel tank, fencing, water service, start-up services, training, site restoration, associated roadway and right-of-way restoration, and all other appurtenances necessary for a complete and accepted project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis