Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD. Provide professional services for a canopy to cover the fuel island.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Fuel Tank and Island Replacement. Saw cut and break out concrete pad and islands, Evacuate and remove piping and tanks for disposal, current tanks are 10 foot in diameter, Shoring should be supplied due to the depth of the excavation, Fencing around excavation should be supplied, All dirt and pea stone shall be removed offsite and will be the responsibility of the contractor, Furnish and install two (2) 15,000 gallon double walled, fiberglass USTs. Tanks shall be 8-foot diameter.
Posted Date
Nov 24, 2025
Due Date
Jan 6, 2026
Release: Nov 24, 2025
Close: Jan 6, 2026
Fuel Tank and Island Replacement. Saw cut and break out concrete pad and islands, Evacuate and remove piping and tanks for disposal, current tanks are 10 foot in diameter, Shoring should be supplied due to the depth of the excavation, Fencing around excavation should be supplied, All dirt and pea stone shall be removed offsite and will be the responsibility of the contractor, Furnish and install two (2) 15,000 gallon double walled, fiberglass USTs. Tanks shall be 8-foot diameter.
Premium
Access the largest public sector contact database
Replacement of the fuel island.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Replacement of the fuel island.
AvailableFuel island replacement project.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Fuel island replacement project.
AvailableDesign-Build: Provide turnkey design and construction of a new hurricane-rated open-air canopy covering the existing multipurpose rink. includes structural foundations, full-coverage roof system, LED sports lighting, HVLS fans, modular sports flooring, athletic equipment, sitework, and drainage improvements, add alternates include entry pavilion, bleacher pavilion, and sound system.
Posted Date
Nov 24, 2025
Due Date
Jan 16, 2026
Release: Nov 24, 2025
Close: Jan 16, 2026
Design-Build: Provide turnkey design and construction of a new hurricane-rated open-air canopy covering the existing multipurpose rink. includes structural foundations, full-coverage roof system, LED sports lighting, HVLS fans, modular sports flooring, athletic equipment, sitework, and drainage improvements, add alternates include entry pavilion, bleacher pavilion, and sound system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis