Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct approx. 1,600 LF of 8" DI main and other work includes 436 ton HMA pavement for overlay, 3,206 LF pavement paint, 2,671 SY bituminous planing/milling, 1,763 LF sawcutting, 144 ton crushed surfacing base course.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of water system through construction and installation of water main connections, a combination pressure reducing/sustaining valve, well site electrical and control upgrades, discharge manifold construction, hot taps and roadway restoration.
Posted Date
Nov 21, 2025
Due Date
Jan 7, 2026
Release: Nov 21, 2025
Close: Jan 7, 2026
Project consists of water system through construction and installation of water main connections, a combination pressure reducing/sustaining valve, well site electrical and control upgrades, discharge manifold construction, hot taps and roadway restoration.
AvailablePremium
Access the largest public sector contact database
Water main replacement.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Water main replacement.
AvailableWater Main Replacement project generally includes the furnishing of all labor, materials, equipment, and incidentals necessary to complete the installation of approx 2,830 LF of new water main infrastructure. The project consists of 430 LF of 16" diameter ductile iron pipe (DIP) with nitrile gaskets, 20 LF of 16" diameter DIP with a 24" diameter casing pipe, 2,300 LF of 16" diameter polyvinyl chloride (PVC) pipe, 60 LF of 8" diameter PVC Pipe, and 20 LF of 12" diameter PVC pipe. Work shall include, but is not limited to, trench excavation and backfill, pipe installation, installation of valves, fittings, hydrants, restrained joints, thrust restraints, air release valves and pits, connections to existing mains, flushing, pressure testing, disinfection, and surface restoration.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Close: Jan 13, 2026
Water Main Replacement project generally includes the furnishing of all labor, materials, equipment, and incidentals necessary to complete the installation of approx 2,830 LF of new water main infrastructure. The project consists of 430 LF of 16" diameter ductile iron pipe (DIP) with nitrile gaskets, 20 LF of 16" diameter DIP with a 24" diameter casing pipe, 2,300 LF of 16" diameter polyvinyl chloride (PVC) pipe, 60 LF of 8" diameter PVC Pipe, and 20 LF of 12" diameter PVC pipe. Work shall include, but is not limited to, trench excavation and backfill, pipe installation, installation of valves, fittings, hydrants, restrained joints, thrust restraints, air release valves and pits, connections to existing mains, flushing, pressure testing, disinfection, and surface restoration.
AvailableRelease: Nov 5, 2025
Close: Dec 12, 2025
Water main improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis