Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of North Las Vegas
Project consists of clearing, demolishing and removing buildings, parking lot features, landscaping, concrete, asphalt, and other elements. The work involves preparatory work, environmental abatement with the presence of lead, asbestos, and other hazardous materials, clearing, removing, coordinating with non-city owned utility and permitting agencies, and associated appurtenances.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
College Of Southern Nevada
Work consists of upgrades Campus Automotive Building HVAC System. Remove existing HVAC unit and install a new Dedicated Outside Air System DOAS) unit and mini-split units.
Posted Date
Oct 23, 2025
Due Date
Nov 20, 2025
Release: Oct 23, 2025
College Of Southern Nevada
Close: Nov 20, 2025
Work consists of upgrades Campus Automotive Building HVAC System. Remove existing HVAC unit and install a new Dedicated Outside Air System DOAS) unit and mini-split units.
AvailableTown of Snow Hill
Phase I of this project includes the following Work: Phase I - Well No. 4 Rehabilitation, including but not limited to: Complete Replacement of Well No. 4 well casing and Screens with new 304 ss casing and screens to include Acid Clean and Air Burst Technology Already Completed: Installation of 375 GPM Submersible Turbine Test Well Pump and performance of 24-hour Drawdown Test of rehabilitated well to determine ultimate Well Yield; Performance of full Bacteriological Analysis, Inorganic Chemical Analysis, Radiological Analysis, Volatile Organic Compound Analysis, Synthetic Organic Compound Analysis.
Posted Date
-
Due Date
Dec 16, 2025
Town of Snow Hill
Close: Dec 16, 2025
Phase I of this project includes the following Work: Phase I - Well No. 4 Rehabilitation, including but not limited to: Complete Replacement of Well No. 4 well casing and Screens with new 304 ss casing and screens to include Acid Clean and Air Burst Technology Already Completed: Installation of 375 GPM Submersible Turbine Test Well Pump and performance of 24-hour Drawdown Test of rehabilitated well to determine ultimate Well Yield; Performance of full Bacteriological Analysis, Inorganic Chemical Analysis, Radiological Analysis, Volatile Organic Compound Analysis, Synthetic Organic Compound Analysis.
AvailableTown of Peralta
Demolition and debris removal.
Posted Date
Nov 6, 2025
Due Date
Nov 28, 2025
Release: Nov 6, 2025
Town of Peralta
Close: Nov 28, 2025
Demolition and debris removal.
AvailableCollege Of Southern Nevada
The replacement of the evaporative coolers.
Posted Date
Nov 12, 2025
Due Date
Dec 16, 2025
Release: Nov 12, 2025
College Of Southern Nevada
Close: Dec 16, 2025
The replacement of the evaporative coolers.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis