City of Ocoee
Flewelling 2- inch water main replacement.
City of Topeka
Work includes the replacement of primarily 2” (approx. 560 LF), 6” (approx. 4,000 LF), and 8” waterline (approx. 2,200 LF) by HDD and or conventional excavation and backfill. This project also includes the replacement of 12” waterline crossing 41st Street on the south end of the project. The replacement of water services, valves, fittings, fire hydrants, and other miscellaneous appurtenances are also included with the work.
City of Temple Terrace
Work includes the relocation of water lines from rear yard easements. Installation of approximately 3,500 linear feet of 6-inch c900 pvc water main. Approximately 5,900 linear feet of old water mains within the row, side and rear yard easements are expected to be grout filled and abandoned. Relocate water and irrigation service connections from the side or rear lot lines to the new water mains located in the front of the lots in the public rights-of-way.
Washington Suburban Sanitary Commission (WSSC)
Contract consists of the replacement of approx 85 FT of 6" water house connection, 440 FT of fire hydrant leads, 410 FT of 8" water house connection, 450" of 8" water main, 45 FT of 10" water house connection, 185 FT of 10" water main, 240 FT of 12" water main, 9,160 FT of 24" water main and 335 FT of water house connections.
Release
Oct 05, 2025
Close
Nov 04, 2025