Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes trades needed: demo: standard interior demo, include flooring demo steel: rtu reinforcements drywall/carpentry: typical dw/metal framing, frp sales fixtures: install sales fixtures finish carpentry/ millwork/ casework: install wallpaper, casework roofing: flash rtus, exhaust fans eifs doors/frame/hardware: f+i all doors glass/ glass glazing: new storefront flooring: lvt, rubber base, patch mall tile, no polished concrete (by others) paint/ wallcovering: interior, exterior, open deck plumbing: supply and install new fixtures, accessories sprinkler hvac: install only 4 new rtus, new ductwork, f+i 2 exhaust fans, thermostat, new heater electrical: existing panels, install ems system, lighting package (provided by fb) fire alarm final clean dumpster. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Close: Dec 31, 2025
Interior Fit-Out.
AvailablePremium
Access the largest public sector contact database
Design-build: work consists of demolishing an abandoned water tower and the associated underground water piping back to the existing valve and capping, new life safety infrastructure will need to be installed for the main building kitchen and dining area to provide adequate water pressure for the sprinkler system, the project will also consist of installing a new campus generator to the electrical infrastructure to provide adequate emergency power to the dormitories, kitchen, and central utility plant, the project will also consist of multiple roof replacements.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
Design-build: work consists of demolishing an abandoned water tower and the associated underground water piping back to the existing valve and capping, new life safety infrastructure will need to be installed for the main building kitchen and dining area to provide adequate water pressure for the sprinkler system, the project will also consist of installing a new campus generator to the electrical infrastructure to provide adequate emergency power to the dormitories, kitchen, and central utility plant, the project will also consist of multiple roof replacements.
AvailableThe Federal Emergency Management Agency (FEMA) issued Solicitation 70FB7026R00000007 to establish a single‑award IDIQ contract for generators rated 400 kW and below to support disaster relief operations. The contract is a firm‑fixed‑price IDIQ with a performance period of approximately three years, requiring Tier 4 Final emissions compliance, weatherproof/rustproof power modules, 3‑phase voltage switchability, integrated load bank systems, and a 24‑hour external fuel tank capability. Proposals must be submitted through SAM.gov; the solicitation was posted December 16, 2025 with proposals due January 13, 2026 at 12:00 PM EST.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
The Federal Emergency Management Agency (FEMA) issued Solicitation 70FB7026R00000007 to establish a single‑award IDIQ contract for generators rated 400 kW and below to support disaster relief operations. The contract is a firm‑fixed‑price IDIQ with a performance period of approximately three years, requiring Tier 4 Final emissions compliance, weatherproof/rustproof power modules, 3‑phase voltage switchability, integrated load bank systems, and a 24‑hour external fuel tank capability. Proposals must be submitted through SAM.gov; the solicitation was posted December 16, 2025 with proposals due January 13, 2026 at 12:00 PM EST.
AvailableFive cemeteries for mowing from May 2026 through October 2026.
Posted Date
Dec 1, 2025
Due Date
Dec 30, 2025
Release: Dec 1, 2025
Close: Dec 30, 2025
Five cemeteries for mowing from May 2026 through October 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.