Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Ida Public School District
Work include existing fixture to be removed or retrofitted and the new fixture to be installed with the necessary trim. Remove and dispose of the existing fixture off-site. Installation of the new fixture including but not limited to all necessary supply, sanitary, and vent piping from the existing fixture removal. Caulking of all new fixtures and all clean up.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Brazosport Water Authority
Filter media replacement and filter rehabilitation.
Posted Date
Nov 18, 2025
Due Date
Dec 9, 2025
Release: Nov 18, 2025
Brazosport Water Authority
Close: Dec 9, 2025
Filter media replacement and filter rehabilitation.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Escanaba Area School District
Work include replacement of all existing drinking fountains with new filtered drinking fountains with bottle fillers and possible installation of several new filtered drinking fountain locations, including all demolition, plumbing, electrical and associated work.
Posted Date
Nov 6, 2025
Due Date
Dec 3, 2025
Release: Nov 6, 2025
Escanaba Area School District
Close: Dec 3, 2025
Work include replacement of all existing drinking fountains with new filtered drinking fountains with bottle fillers and possible installation of several new filtered drinking fountain locations, including all demolition, plumbing, electrical and associated work.
AvailableHuntsville Utilities
Work includes the removal, disposal, inspection, and replacement of filter media within existing gravity/pressure filter units.
Posted Date
Nov 5, 2025
Due Date
Dec 11, 2025
Release: Nov 5, 2025
Huntsville Utilities
Close: Dec 11, 2025
Work includes the removal, disposal, inspection, and replacement of filter media within existing gravity/pressure filter units.
AvailableLowndes County
Plumbing fixture renovation and water- tree system replacement project.
Posted Date
Nov 25, 2025
Due Date
Jan 8, 2026
Release: Nov 25, 2025
Lowndes County
Close: Jan 8, 2026
Plumbing fixture renovation and water- tree system replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →