Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Southeastern Pennsylvania Transportation Authority
12 Ea file 10" smooth nicholson nu-cut 3 square.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
U.S. Army Engineer District Jacksonville
Work consist of maintenance dredging, the contract base element consists of maintenance dredging between portions of bar cut-3 station 198+00 to cut-17 station 0+00.
Posted Date
Jun 27, 2025
Due Date
Jan 27, 2026
Release: Jun 27, 2025
U.S. Army Engineer District Jacksonville
Close: Jan 27, 2026
Work consist of maintenance dredging, the contract base element consists of maintenance dredging between portions of bar cut-3 station 198+00 to cut-17 station 0+00.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
South Carolina Department of Transportation
Supply 4 - 20' sections of 60" 10-gauge Aluminum Smooth Wall pipe with Connecting Bands and Neoprene gaskets.
Posted Date
Nov 10, 2025
Due Date
Dec 15, 2025
Release: Nov 10, 2025
South Carolina Department of Transportation
Close: Dec 15, 2025
Supply 4 - 20' sections of 60" 10-gauge Aluminum Smooth Wall pipe with Connecting Bands and Neoprene gaskets.
AvailableSavannah Airport Commission
Ten (10) powered wheelchairs.
Posted Date
Aug 13, 2025
Due Date
Dec 19, 2025
Release: Aug 13, 2025
Savannah Airport Commission
Close: Dec 19, 2025
Ten (10) powered wheelchairs.
AvailableWashington County Community College
Provide full renovation of apartment #3. The project encompasses window and door replacements, kitchen remodel, bathroom updates, flooring, surface repairs, appliance relocation, and exterior siding replacement. Project includes: install (2) new cottage-style mathews brothers windows (kitchen and living room). Install (1) new single-hung mathews brothers window in bedroom a. Install (2) single-hung mathews brothers replacement windows in bedrooms b & c. Install new steel entry door with metal frame, bored for mortise lockset, including threshold. Install new accordion-style bathroom privacy door. Install new antra omni beachwood kitchen cabinets and new countertop. Install new single-bowl stainless steel kitchen sink. See attached file.
Posted Date
Nov 20, 2025
Due Date
Dec 8, 2025
Release: Nov 20, 2025
Washington County Community College
Close: Dec 8, 2025
Provide full renovation of apartment #3. The project encompasses window and door replacements, kitchen remodel, bathroom updates, flooring, surface repairs, appliance relocation, and exterior siding replacement. Project includes: install (2) new cottage-style mathews brothers windows (kitchen and living room). Install (1) new single-hung mathews brothers window in bedroom a. Install (2) single-hung mathews brothers replacement windows in bedrooms b & c. Install new steel entry door with metal frame, bored for mortise lockset, including threshold. Install new accordion-style bathroom privacy door. Install new antra omni beachwood kitchen cabinets and new countertop. Install new single-bowl stainless steel kitchen sink. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →