Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of the FuelMaster pedestal (FMU-25000PLUSG model), installation of new underground electrical wiring and conduits, and reconfiguration of existing dispensers and associated components.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replace boilers & controls. This project would involve draining the system, removing existing boiler, removing hot water supply and return piping as required, disconnecting existing main power and gas piping, provide and install new Aldrich or like boiler, removing existing expansion tanks and providing and installing new expansion tank, provide and install new hot water supply and return piping as required by installation, provide and install new boiler pump, provide and install new low water cutoffs and safeties, provide and install new flew connections as required, reconnect existing main power wiring and gas piping, and provide startup and testing. See attached file.
Posted Date
Dec 10, 2025
Due Date
Jan 9, 2026
Release: Dec 10, 2025
Close: Jan 9, 2026
Premium
Access the largest public sector contact database
Replace boilers & controls. This project would involve draining the system, removing existing boiler, removing hot water supply and return piping as required, disconnecting existing main power and gas piping, provide and install new Aldrich or like boiler, removing existing expansion tanks and providing and installing new expansion tank, provide and install new hot water supply and return piping as required by installation, provide and install new boiler pump, provide and install new low water cutoffs and safeties, provide and install new flew connections as required, reconnect existing main power wiring and gas piping, and provide startup and testing. See attached file.
Replace high mast light #4. Replacing one (1) 100' Carolina or equivalent high mast pole including new cables, wires, and LED fixtures. The contractor will remove and dispose of the existing 100' pole and lighting fixture.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Replace high mast light #4. Replacing one (1) 100' Carolina or equivalent high mast pole including new cables, wires, and LED fixtures. The contractor will remove and dispose of the existing 100' pole and lighting fixture.
AvailableReplace Roofs FCI 1 & SPC at the Federal Prison Camp. Replacing approx. 47,000 SF. of ceiling, 1,000 sq. ft. of skylights with associated framing, 115,000 sq. ft. of standing seam metal roofing, 30,200 sq. ft. of modified bituminous roofing, and 141,000 SF. of exposed fastener metal roofing systems.
Posted Date
Dec 1, 2025
Due Date
Jan 20, 2026
Release: Dec 1, 2025
Close: Jan 20, 2026
Replace Roofs FCI 1 & SPC at the Federal Prison Camp. Replacing approx. 47,000 SF. of ceiling, 1,000 sq. ft. of skylights with associated framing, 115,000 sq. ft. of standing seam metal roofing, 30,200 sq. ft. of modified bituminous roofing, and 141,000 SF. of exposed fastener metal roofing systems.
AvailableThis is a Request for Qualifications (RFQ) issued by the City of Seaside, OR to select a consulting engineering firm to develop an updated Sewer Master Plan addressing current and future wastewater treatment and collection system needs, including hydraulic modeling, flow projections, and a Capital Improvement Plan. The project includes a planning horizon through 2046, with work performed in Seaside, OR, and requires a City business license and completion of pay equity training prior to award.
Posted Date
Dec 3, 2025
Due Date
Dec 30, 2025
Release: Dec 3, 2025
Close: Dec 30, 2025
This is a Request for Qualifications (RFQ) issued by the City of Seaside, OR to select a consulting engineering firm to develop an updated Sewer Master Plan addressing current and future wastewater treatment and collection system needs, including hydraulic modeling, flow projections, and a Capital Improvement Plan. The project includes a planning horizon through 2046, with work performed in Seaside, OR, and requires a City business license and completion of pay equity training prior to award.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis