Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction management / general contractor services for Farmington fire station, includes, constructing an approx 21,800 SF fire station and all site improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide architectural services for the remodel of fire station. Architectural services to provide conceptual design documents, including site and floor plans, building exterior elevations, landscape plans, parking plans, utility plans.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Provide architectural services for the remodel of fire station. Architectural services to provide conceptual design documents, including site and floor plans, building exterior elevations, landscape plans, parking plans, utility plans.
AvailablePremium
Access the largest public sector contact database
Seismic retrofit of the existing fire station.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
Seismic retrofit of the existing fire station.
AvailableSeeking construction manager-at-risk services for a new police station and renovation of a fire sub station.
Posted Date
Nov 20, 2025
Due Date
Dec 23, 2025
Release: Nov 20, 2025
Close: Dec 23, 2025
Seeking construction manager-at-risk services for a new police station and renovation of a fire sub station.
AvailableSeeking qualified firms or consultants to conduct a comprehensive fire station building condition assessment and station location study. Evaluate the six fire stations for: condition assessment narrative; structural integrity and building envelope condition; hvac, plumbing, electrical, and mechanical systems; code and ada compliance; service life and sustainability; deferred maintenance and life cycle costs; space utilization, ergonomics, and operational functionality; service life of operational equipment (doors, windows, paint, sidewalks, concrete, brick work, retaining walls, etc. ); assessment of maintenance approach compared to new construction estimates. See outside link.
Posted Date
Dec 1, 2025
Due Date
Feb 5, 2026
Release: Dec 1, 2025
Close: Feb 5, 2026
Seeking qualified firms or consultants to conduct a comprehensive fire station building condition assessment and station location study. Evaluate the six fire stations for: condition assessment narrative; structural integrity and building envelope condition; hvac, plumbing, electrical, and mechanical systems; code and ada compliance; service life and sustainability; deferred maintenance and life cycle costs; space utilization, ergonomics, and operational functionality; service life of operational equipment (doors, windows, paint, sidewalks, concrete, brick work, retaining walls, etc. ); assessment of maintenance approach compared to new construction estimates. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis