Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of new construction. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of new construction. See outside link.
Posted Date
-
Due Date
Jan 1, 2026
Close: Jan 1, 2026
Project consists of new construction. See outside link.
AvailablePremium
Access the largest public sector contact database
Project consists of new construction. See outside link.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Project consists of new construction. See outside link.
AvailableProject consists of new construction. See outside link.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Project consists of new construction. See outside link.
AvailableWork includes approx 112,150 SF tilt industrial building on an 8.35-acre site. The scope of work consists of but is not limited to the following: erosion control, grading, soil remediation (included in the base bid),storm, utilities, asphalt paving, site concrete, walks, dumpster enclosure, landscaping, concrete, tilt concrete, structural and misc. steel, roofing, waterproofing, joint sealants, ACM, hollow metal, door hardware, storefront, overhead doors and equipment, metal framing, drywall, painting, sprinker, DESIGN-BUILD PME. See outside link.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Work includes approx 112,150 SF tilt industrial building on an 8.35-acre site. The scope of work consists of but is not limited to the following: erosion control, grading, soil remediation (included in the base bid),storm, utilities, asphalt paving, site concrete, walks, dumpster enclosure, landscaping, concrete, tilt concrete, structural and misc. steel, roofing, waterproofing, joint sealants, ACM, hollow metal, door hardware, storefront, overhead doors and equipment, metal framing, drywall, painting, sprinker, DESIGN-BUILD PME. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis