Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Disconnect and removal of two 12.5kv generators and associated enclosures, and empty fuel tanks, demolition of 15kv generator switchgear, demolition of all interconnecting power and controls conductors, closeout and abandonment of underground overflow tank and associated piping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Diesel Generators.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Purchase of generators, various sizes.
Posted Date
Nov 25, 2025
Due Date
Jan 7, 2026
Release: Nov 25, 2025
Close: Jan 7, 2026
Purchase of generators, various sizes.
Available1,000 and 475 kW Generators 1600A and 800A Automatic Transfer Switches. SCADA Integration. All wiring, trenching, foundations and incidentals.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
Close: Dec 18, 2025
1,000 and 475 kW Generators 1600A and 800A Automatic Transfer Switches. SCADA Integration. All wiring, trenching, foundations and incidentals.
AvailableWork consists of the construction of 104 LF of new 18" diameter SDR 26 PVC sewer, two manholes, connection to existing lines, bypass pumping, dewater lift station wet well and flush force main, trench safety, decommission lift station including remove pumps and service panel and deliver to public Works yard, remove generator and switch gear and deliver to animal shelter, break up concrete to fill hole, cover with soil and re-vegetate and water of disturbed areas, and SWPPP. The work also includes furnishing and installing fall protection grates at the Weaver Street Lift Station and Gateway Boulevard Lift station.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work consists of the construction of 104 LF of new 18" diameter SDR 26 PVC sewer, two manholes, connection to existing lines, bypass pumping, dewater lift station wet well and flush force main, trench safety, decommission lift station including remove pumps and service panel and deliver to public Works yard, remove generator and switch gear and deliver to animal shelter, break up concrete to fill hole, cover with soil and re-vegetate and water of disturbed areas, and SWPPP. The work also includes furnishing and installing fall protection grates at the Weaver Street Lift Station and Gateway Boulevard Lift station.