Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Maryland Motor Vehicle Administration (MVA) is soliciting proposals to replace emergency generators and automatic transfer switches (ATS) at the MVA Glen Burnie Facility, including demolition, removal of existing equipment, installation of a new 150 kW indoor generator with sub-base tank and 75 kW load bank, two 480V 3-phase ATSs, new panelboards, feeders, HVAC and civil/duct bank work, and associated electrical/mechanical systems. The contractor must provide testing and commissioning services with at least three years of comparable experience and implement project-specific measures to reduce environmental impacts. The solicitation includes MBE (30%) and VSBE (1%) participation goals and directs bidders to the official bid source for full documentation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Furnish and install a 40kW natural gas standby generator with an automatic transfer switch (ATS) at its facility.
Posted Date
Dec 7, 2025
Due Date
Jan 23, 2026
Release: Dec 7, 2025
Close: Jan 23, 2026
Furnish and install a 40kW natural gas standby generator with an automatic transfer switch (ATS) at its facility.
AvailableReplacement of the emergency generator serving the Monico Emergency Management tower site.
Posted Date
Dec 2, 2025
Due Date
Jan 30, 2026
Release: Dec 2, 2025
Close: Jan 30, 2026
Replacement of the emergency generator serving the Monico Emergency Management tower site.
AvailableWork consists of: replacing the existing 250 kilowatt exterior generator serving rita tallent picken regional center for the arts and humanities on the uw-parkside campus. The existing generator and associated accessories, components, conductors, etc. Shall be demolished and replaced with new, as described within the project documents. The new generator is sized and rated to match the existing genset specification. Existing conduit paths, raceway, pull and junction boxes shall be salvaged and protected for the installation of new conductors between the new generator and existing downstream distribution equipment.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Work consists of: replacing the existing 250 kilowatt exterior generator serving rita tallent picken regional center for the arts and humanities on the uw-parkside campus. The existing generator and associated accessories, components, conductors, etc. Shall be demolished and replaced with new, as described within the project documents. The new generator is sized and rated to match the existing genset specification. Existing conduit paths, raceway, pull and junction boxes shall be salvaged and protected for the installation of new conductors between the new generator and existing downstream distribution equipment.
Provide generator replacement and installation of new generators at ten (10) wastewater pump stations. Work includes replacement of automatic transfer switches and electrical work at facilities. Salvage of existing generators and automatic transfer switches is by the contractor. Some facilities require structural modifications, fuel system modifications, hvac modifications, and concrete pads for equipment.
Posted Date
Oct 22, 2025
Due Date
Dec 16, 2025
Release: Oct 22, 2025
Close: Dec 16, 2025
Provide generator replacement and installation of new generators at ten (10) wastewater pump stations. Work includes replacement of automatic transfer switches and electrical work at facilities. Salvage of existing generators and automatic transfer switches is by the contractor. Some facilities require structural modifications, fuel system modifications, hvac modifications, and concrete pads for equipment.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis