Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Carlsbad
The Carlsbad Municipal Water District is seeking a contractor to provide all labor, materials, tools, equipment, and services to replace the interior and exterior coating systems and construct associated sanitary and safety improvements at the following potable water tanks: - Elm Tank1.5 Million Gallon capacity, Shell Height: 22.5-ft, Shell Diameter: 106-ftAdjacent to 3151 Donna Drive, Carlsbad CA 92008- Skyline Tank1.5 Million Gallon capacity, Shell Height: 22.5-ft, Shell Diameter: 106-ftAdjacent to 4275 Skyline Road, Carlsbad CA 92008.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
San Francisco Public Utilities Commission (SFPUC)
Recoat the roof slab.
Posted Date
Nov 13, 2025
Due Date
Dec 11, 2025
Release: Nov 13, 2025
San Francisco Public Utilities Commission (SFPUC)
Close: Dec 11, 2025
Recoat the roof slab.
AvailableUnion County
The project consists of refurbishment of an existing elevated tank. Interior coating of 1. 0-million-gallon multi-leg steel elevated storage tank including painting and coating. Interior tank accessories replacements and repairs
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Union County
Close: Dec 18, 2025
The project consists of refurbishment of an existing elevated tank. Interior coating of 1. 0-million-gallon multi-leg steel elevated storage tank including painting and coating. Interior tank accessories replacements and repairs
AvailableWinston Dillard Water District
Removal and disposal of existing 1 MG riveted steel tank and appurtenances including piping, valves and vault at Winston Site. Installation of temporary shoring wall to protect existing 0.5 MG steel bolted tank at Winston Site during construction. Removal, disposal of existing 0.5 MG steel bolted tank and appurtenances at Winston Site. Site preparation, schedule coordination and construction coordination of the new 2.0 MG glss fused steel bolted tank and appurtenances. Tank has been pre-procured per the scope between the Owner and Tank Supplier at the Winston Site. Furnish and install new valve vault, valves, manholes, piping and all other appurtenances. Furnish and install of new Electrical and Supervisory Control and Data Acquisition (SCADA) system equipment at Winston and Dillard Sites. Procurement shall be contracted through Owner's Integrator, Control Systems Northwest. System Integration will be conducted by Owner's Integrator through Owner's contract. Furnish and install Electrical Mixing System at Winston Site and Solar Mixing System at the Dillard Site. Furnish and install a new valve vault and appurtenances, a new hatch with interior ladder and interior coating (floor, 3' from floor and spot coating) at Dillard Site as described on the Bidding Documents. Site grading and restoration. See attached file.
Posted Date
Oct 17, 2025
Due Date
Dec 10, 2025
Release: Oct 17, 2025
City of Madison
Reservoir Painting
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
City of Madison
Close: Dec 17, 2025
Reservoir Painting
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Winston Dillard Water District
Close: Dec 10, 2025
Removal and disposal of existing 1 MG riveted steel tank and appurtenances including piping, valves and vault at Winston Site. Installation of temporary shoring wall to protect existing 0.5 MG steel bolted tank at Winston Site during construction. Removal, disposal of existing 0.5 MG steel bolted tank and appurtenances at Winston Site. Site preparation, schedule coordination and construction coordination of the new 2.0 MG glss fused steel bolted tank and appurtenances. Tank has been pre-procured per the scope between the Owner and Tank Supplier at the Winston Site. Furnish and install new valve vault, valves, manholes, piping and all other appurtenances. Furnish and install of new Electrical and Supervisory Control and Data Acquisition (SCADA) system equipment at Winston and Dillard Sites. Procurement shall be contracted through Owner's Integrator, Control Systems Northwest. System Integration will be conducted by Owner's Integrator through Owner's contract. Furnish and install Electrical Mixing System at Winston Site and Solar Mixing System at the Dillard Site. Furnish and install a new valve vault and appurtenances, a new hatch with interior ladder and interior coating (floor, 3' from floor and spot coating) at Dillard Site as described on the Bidding Documents. Site grading and restoration. See attached file.
Available