Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Inspection and test procedures for switchgear preventive maintenance: Inspect for physical damage, proper anchorage, and grounding. Compare equipment name plate information to compatibility of installation. Check for proper anchorage, required clearance and proper alignment. Use low resistance ohm meter on switchboard disconnects. Check tightness of bolted connections by calibrated torque wrench method according to manufacturer's recommendations. Verify any interlocking systems.. Inspect accessible insulators for evidence of physical damage or contamination.. Exercise all active components. Vacuum the interior of switchboards. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Two (2) Year Contract for Preventative Maintenance and Repairs of Electrical Switchgear and Related Equipment.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
Two (2) Year Contract for Preventative Maintenance and Repairs of Electrical Switchgear and Related Equipment.
AvailableThis RFP is for a two-year contract for preventative maintenance and repairs of electrical switchgear and related equipment.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
This RFP is for a two-year contract for preventative maintenance and repairs of electrical switchgear and related equipment.
AvailableProvide hvac preventative maintenance services.
Posted Date
Nov 24, 2025
Due Date
Dec 29, 2025
Release: Nov 24, 2025
Close: Dec 29, 2025
Provide hvac preventative maintenance services.
AvailableProject consists of switchboard electrical gear. See outside link.
Posted Date
Nov 25, 2025
Due Date
Dec 12, 2025
Release: Nov 25, 2025
Close: Dec 12, 2025
Project consists of switchboard electrical gear. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis