Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Victoria
The water plant is requesting quotes for electrical parts.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Worcester
Electrical system testing services and related work at water filtration plant.
Posted Date
Nov 7, 2025
Due Date
Dec 5, 2025
Release: Nov 7, 2025
City of Worcester
Close: Dec 5, 2025
Electrical system testing services and related work at water filtration plant.
AvailableTown of Riverhead
Rehabilitation of Plant No. 7 - Electrical Upgrades Riverhead Water District.
Posted Date
-
Due Date
Nov 20, 2025
Town of Riverhead
Close: Nov 20, 2025
Rehabilitation of Plant No. 7 - Electrical Upgrades Riverhead Water District.
AvailableOhio Department of Natural Resources
Provide wastewater treatment plant operations for three state parks. Weekly/monthly/ quarterly testing, sampling and reporting required by the oepa for water and wastewater. Alloway labs picks up samples on fridays. Sampling cost will be paid by odnr. Complete monthly epa dmr (discharge monitor report), monthly drinking water report (edwr), and monthly staffing reports via ebiz.
Posted Date
Sep 15, 2025
Due Date
Nov 18, 2025
Release: Sep 15, 2025
Ohio Department of Natural Resources
Close: Nov 18, 2025
Provide wastewater treatment plant operations for three state parks. Weekly/monthly/ quarterly testing, sampling and reporting required by the oepa for water and wastewater. Alloway labs picks up samples on fridays. Sampling cost will be paid by odnr. Complete monthly epa dmr (discharge monitor report), monthly drinking water report (edwr), and monthly staffing reports via ebiz.
University Of North Carolina At Chapel Hill
Work consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.
Posted Date
Aug 18, 2025
Due Date
Jan 14, 2026
Release: Aug 18, 2025
University Of North Carolina At Chapel Hill
Close: Jan 14, 2026
Work consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis