Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Arc Flash study is to identify and verify potential arc flash problems, initiate appropriate safety action, explore solutions and remediation to the arc flash problem with the existing electrical distribution system including switchgears, transformers, circuit systems etc, results from the study to make adjustments on the equipment The intent of the Arc Flash study is to identify and verify potential arc flash problems, initiate and develop operations and maintenance for the various VAPIHCS facilities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Implement an arc flash hazard assessment to enhance our electrical safety program, provide additional safety measures for our employees, and provide compliance with Cal-OSHA regulatory mandates. Metro plans to retain a qualified firm to assist in the development and implementation of the arc flash assessment.
Posted Date
Oct 22, 2025
Due Date
Dec 15, 2025
Release: Oct 22, 2025
Close: Dec 15, 2025
Implement an arc flash hazard assessment to enhance our electrical safety program, provide additional safety measures for our employees, and provide compliance with Cal-OSHA regulatory mandates. Metro plans to retain a qualified firm to assist in the development and implementation of the arc flash assessment.
AvailableThis project consists of the review and assessment of approximately 210 water distribution and auxiliary hydrant valves and 81 hydrants to collect detailed condition data capable of guiding future system improvement decisions.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
This project consists of the review and assessment of approximately 210 water distribution and auxiliary hydrant valves and 81 hydrants to collect detailed condition data capable of guiding future system improvement decisions.
AvailableThis project consists of the review and assessment of approximately 210 water distribution and auxiliary hydrant valves and 81 hydrants to collect detailed condition data capable of guiding future system improvement decisions.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
This project consists of the review and assessment of approximately 210 water distribution and auxiliary hydrant valves and 81 hydrants to collect detailed condition data capable of guiding future system improvement decisions.
AvailableRequesting an Arc Flash Study for employee Safety and correct PPE (Personal Protective Equipment). Contractor will provide an Arc Flash Hazard Analysis study in accordance with NFPA 70E Standards for electrical safety in the work place and IEEE Standard 1584-Electrical guide to performing Arc Flash Hazard Calculations.
Posted Date
Jan 30, 2025
Due Date
Feb 10, 2027
Release: Jan 30, 2025
Close: Feb 10, 2027
Requesting an Arc Flash Study for employee Safety and correct PPE (Personal Protective Equipment). Contractor will provide an Arc Flash Hazard Analysis study in accordance with NFPA 70E Standards for electrical safety in the work place and IEEE Standard 1584-Electrical guide to performing Arc Flash Hazard Calculations.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis