Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1,760 FT - sewer, CIPP, 10", full length; 480 FT - sewer, CIPP, 12", full length; 720 FT - sewer, CIPP, 15", full length; 400 FT - sewer, CIPP, 18", full length; 320 FT - sewer, CIPP, 21", full length.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
Premium
Access the largest public sector contact database
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
Posted Date
Nov 26, 2025
Due Date
Jan 14, 2026
Release: Nov 26, 2025
Close: Jan 14, 2026
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
AvailableThe City of Jacksonville (NC) has posted an RFB titled 'RFB-FY 23-24 Sanitary Sewer Rehabilitation CIPP Lining' to procure cured-in-place pipe (CIPP) lining and related sanitary sewer rehabilitation services. The BidNet posting lists publication date 2025-12-03 and a bid/closing date of 2026-01-13 at 3:00 PM EST, and the solicitation documents and buyer contact details are available to registered BidNet users. No separate buyer-hosted solicitation PDF or Doc was found on the City’s public website; public aggregators note the City as the owner and provide additional project summary details (e.g., pre-bid conference and DBE goal).
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
The City of Jacksonville (NC) has posted an RFB titled 'RFB-FY 23-24 Sanitary Sewer Rehabilitation CIPP Lining' to procure cured-in-place pipe (CIPP) lining and related sanitary sewer rehabilitation services. The BidNet posting lists publication date 2025-12-03 and a bid/closing date of 2026-01-13 at 3:00 PM EST, and the solicitation documents and buyer contact details are available to registered BidNet users. No separate buyer-hosted solicitation PDF or Doc was found on the City’s public website; public aggregators note the City as the owner and provide additional project summary details (e.g., pre-bid conference and DBE goal).
AvailableWork includes sanitary rehabilitation services for cured-in-place pipe (CIPP) lining, cleaning, inspection, and rehabilitation of sanitary sewer pipes. The term of contract is for three years, for two additional one-year periods.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
Work includes sanitary rehabilitation services for cured-in-place pipe (CIPP) lining, cleaning, inspection, and rehabilitation of sanitary sewer pipes. The term of contract is for three years, for two additional one-year periods.