Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 9,000 LF of 6" C900 PVC water main with tracer wire; 1,300 LF of 6" DIP installed for vertical/ horizontal bends; 450 LF of 12" steel encasement with 6" ductile iron carrier; 8 new fire hydrants with leg valves; 60 new 3/4" water services with connection to existing meters; abandonment of existing 2 galvanized iron mains as made possible by proposed improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Replace the existing water distribution system, with polyvinyl chloride (PVC) and polyethylene (PE) water distribution system piping. Work includes, but is not limited to, installation of water mains, service lines, meter boxes, fire hydrants, valves and fittings: connecting to existing water distribution system; and completion of all associated site work.
Posted Date
Nov 7, 2025
Due Date
Jan 6, 2026
Release: Nov 7, 2025
Close: Jan 6, 2026
Replace the existing water distribution system, with polyvinyl chloride (PVC) and polyethylene (PE) water distribution system piping. Work includes, but is not limited to, installation of water mains, service lines, meter boxes, fire hydrants, valves and fittings: connecting to existing water distribution system; and completion of all associated site work.
AvailableThe City of Burlington seeks a consultant to provide construction inspection and administration for 2026 water distribution system improvements (replacement of ~2,500 ft of water main). Required services include on‑site inspection, daily reporting, construction administration, materials and independent laboratory testing, public outreach and water‑shutoff notifications, payroll/Davis‑Bacon interviews, SRF/DBE/AIS/BABA compliance, and final project certification. Consultant must be able to register to do business in Vermont and carry required insurance.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Close: Dec 17, 2025
The City of Burlington seeks a consultant to provide construction inspection and administration for 2026 water distribution system improvements (replacement of ~2,500 ft of water main). Required services include on‑site inspection, daily reporting, construction administration, materials and independent laboratory testing, public outreach and water‑shutoff notifications, payroll/Davis‑Bacon interviews, SRF/DBE/AIS/BABA compliance, and final project certification. Consultant must be able to register to do business in Vermont and carry required insurance.
AvailableProject consists of water system improvements.
Posted Date
Nov 30, 2025
Due Date
Dec 19, 2025
Release: Nov 30, 2025
Close: Dec 19, 2025
Project consists of water system improvements.
AvailableProject consists of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters.
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Project consists of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis