Retrieving RFP details
Release
Close
City of Tacoma
To provide progressive design-build (pdb) services for tacoma power south service center improvements project. Work under this project includes design and construction of a new maintenance and storage building, new warehouse, new wash bay, new covered parking, new covered storage, site and traffic flow pattern improvements, and additional administrative and storage features. There are anticipated required site improvements needed as well, including site paving, Stormwater management, on-site septic and site security improvements.
DESIGN-BUILD TPU South Service Center Improvements
zip
City of Chula Vista
Design-Build civic center and south library branches
Savannah State University
DESIGN/BUILD: Tech C Police HVAC improvements.
Enoch Pratt Free Library
Design-build project to include – replacing all of the windows; replacing the main entrance storefront, vestibule and doors; replacing the main entrance canopy; replacing secondary exterior doors and associated frames; connecting all doors included as part of the existing access control and security systems; cleaning and repairing the retaining walls at the front of the building; cleaning all concrete walks and ramps; repairing or replacing all damaged concrete walks and ramps; repairing or replacing all railings, and guardrails; installing new bike racks; making improvements to the plaza/courtyard on the south side of the building to include new landscaping and exterior furniture; installing new exterior lighting; cleaning the south elevation; repaving and restriping the staff parking lot; and installing a new landscaping solution. See attached file and outside link.
Release
Oct 02, 2025
Close
Nov 04, 2025