Retrieving RFP details
Release
Close
Lake County
Project will add new traffic signals to the intersection of Deerfield Parkway and Barclay Boulevard in Buffalo Grove as well as updating curb ramps and closing a median gap along Deerfield Parkway. This project will also add new traffic signals to the intersection of Sunset Avenue and Northern Avenue in Waukegan as well as updating curb ramps and adding a portion of sidewalk along Northern Avenue. This work includes concrete curb and gutter removal and construction, concrete sidewalk removal and construction, HMA driveway removal and replacement, installation of storm sewer and drainage structures, street lighting modification, pavement marking, landscaping, and all associated work necessary to complete the project. Bid items: 5 Ea tree root pruning; 305 CY earth excavation; 448 SY of 4" topsoil furnish and place; 1,236 SY of 4" agg base course, ty B; 552 SF of 7" portland cement conc sidewalk. See attached file.
Attachments
zip
City of Garfield Heights
Drive Reconstruction and Avenue Reconstruction.
County of Los Angeles
Implement traffic signal improvements to include the installation of signal and lighting standards, mast arms, vehicle and pedestrian heads, vehicle and pedestrian detection, and other traffic signal related equipment. Traffic signal synchronization program.
Illinois Department of Transportation
Work includes 1 EA. connection to existing water main; 136 LF cured-in place pipe liner, 8"; 301 LF storm sewers, ductile iron, type 1 8"; 1,301 SY portland cement concrete base course 10"; 1,852 SY portland cement concrete base course widening 10"; 11,603 pound bituminous materials (tack coat); 9,540' longitudinal joint sealant; 689 ton polymerized hot-mix asphalt binder course, IL-4. 75, N50; 18,618 SF portland cement concrete sidewalk 5"; 398' underground conduit, galvanized steel, 2" dia.; 195' underground conduit, galvanized steel, 2 1/2" dia.; 1,785' underground conduit, pvc, 2" dia.; 1,785' underground conduit, coilable nonmetallic conduit, 1 1/4" dia.; 13,105' electric cable in conduit, 600v (XLP-type use) 1/C no. 8.
Release
Oct 23, 2025
Close
Nov 11, 2025