Retrieving RFP details
Release
Close
County of Los Angeles
Implement traffic signal improvements to include the installation of signal and lighting standards, mast arms, vehicle and pedestrian heads, vehicle and pedestrian detection, and other traffic signal related equipment. Traffic signal synchronization program.
Arrow Highway TSSP - Rennell Avenue To Claremont Boulevard - Mills Avenue
zip
Lake County
Project will add new traffic signals to the intersection of Deerfield Parkway and Barclay Boulevard in Buffalo Grove as well as updating curb ramps and closing a median gap along Deerfield Parkway. This project will also add new traffic signals to the intersection of Sunset Avenue and Northern Avenue in Waukegan as well as updating curb ramps and adding a portion of sidewalk along Northern Avenue. This work includes concrete curb and gutter removal and construction, concrete sidewalk removal and construction, HMA driveway removal and replacement, installation of storm sewer and drainage structures, street lighting modification, pavement marking, landscaping, and all associated work necessary to complete the project. Bid items: 5 Ea tree root pruning; 305 CY earth excavation; 448 SY of 4" topsoil furnish and place; 1,236 SY of 4" agg base course, ty B; 552 SF of 7" portland cement conc sidewalk. See attached file.
City of Claremont
The work includes approx 1 LS mobilization; 1 LS traffic control; 1 LS SWPPP; 1 LS clearing and grubbing; 1 LS as-builts; 2 EA adjust manhole frame and cover; 2 EA adjust water valve cover; 1 EA construct PCC curb ramp & sidewalk; 40 SF construct detectable warning surface; 1 EA construct type F curb ramp; 38 LF construct PCC type A1 curb; 165 SF construct PCC sidewalk; 46 SF construct PCC landing; 98 SF construct driveway approach; 111 ton construct 5" hot mix asphalt (HMA); 3,648 SF cold mill 2" AC pavement; 2,200 SF furnish and install stamped asphalt treatment; 100 LF install 6" dual wall HDPE; 2 EA install inline drain inlet; 1 LS signing and striping.
County of Los Angeles
Work includes 670 LF 2-pair detector lead-in cable; 180 LF 5-conductor signal cable(excluding conduit); 15 LF 4" striping (thermoplastic); 10 LF 4" striping yellow (thermoplastic); 16 LF curb markings (two-coat paint); 2 EA sign panel.
Release
Oct 21, 2025
Close
Nov 18, 2025