Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Woodward County
Supply of culvert pipe-poly propylene new steel (structual)-piling used steel (structural) stay-in-place forming-galvanized guard rails galvanized steel bridge planks-nails-rebar.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Marion County
Procurement of plastic, galvanized steel, aluminized steel, and polymer coated steel culverts.
Posted Date
-
Due Date
Jan 5, 2026
Marion County
Close: Jan 5, 2026
Procurement of plastic, galvanized steel, aluminized steel, and polymer coated steel culverts.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Rockland Co Solid Waste Management Auth
Provide fabrication of a steel pedestrian bridge and deflector plate improvements. Remove and salvage the existing wood framed pedestrian bridge. Proposer shall provide all rigging, equipment, and personnel to safely remove the existing wooden pedestrian bridge and store. Fabricate and install a new galvanized steel pedestrian bridge, including beams, embedded anchors, c-channel supports, protective plates, and a 1-1/2 inch galvanized steel i-bar grating. Fabricate and install new 1-1/2 inch diameter galvanized steel post and pipe railing on each side of the bridge and extended from the existing rails. The openings between the new railings and the existing railings shall be closed using rail and post extensions.
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Rockland Co Solid Waste Management Auth
Close: Jan 7, 2026
Provide fabrication of a steel pedestrian bridge and deflector plate improvements. Remove and salvage the existing wood framed pedestrian bridge. Proposer shall provide all rigging, equipment, and personnel to safely remove the existing wooden pedestrian bridge and store. Fabricate and install a new galvanized steel pedestrian bridge, including beams, embedded anchors, c-channel supports, protective plates, and a 1-1/2 inch galvanized steel i-bar grating. Fabricate and install new 1-1/2 inch diameter galvanized steel post and pipe railing on each side of the bridge and extended from the existing rails. The openings between the new railings and the existing railings shall be closed using rail and post extensions.
AvailableElmhurst Park District
Provide structural steel.
Posted Date
Dec 8, 2025
Due Date
Dec 19, 2025
Release: Dec 8, 2025
Elmhurst Park District
Close: Dec 19, 2025
Provide structural steel.
AvailableMi'kmaq Nation
The work will consist of fabricating structural steel and/or bridge railing and delivery to the project site coordinating directly with the bridge contractor selected for the project.
Posted Date
Dec 2, 2025
Due Date
Jan 5, 2026
Release: Dec 2, 2025
Mi'kmaq Nation
Close: Jan 5, 2026
The work will consist of fabricating structural steel and/or bridge railing and delivery to the project site coordinating directly with the bridge contractor selected for the project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →