Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Hocking County
Work includes removal of 543 SY of pavement; 216 CY of excavation; 137. 5' of guardrail, type mgs; 10 CY of rock channel protection, type c with filter; 229 SY of seeding and mulching; 11 SY of repair seeding and mulching; 70' of aggregate drains; 50' of 6" conduit, type e; 65 CY of asphalt concrete base, pg64-22, (449); 49 CY of asphalt concrete surface course, type 1, (449), pg64-22; 184 SY of sealing of concrete surfaces; 439 CY of rock channel protection, type a with aggregate filter. See attached files.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Kentucky Transportation Cabinet
Replace bridge
Posted Date
-
Due Date
Dec 11, 2025
Kentucky Transportation Cabinet
Close: Dec 11, 2025
Replace bridge
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Elk Creek
Work includes 49,463 LB reinforcement bars, epoxy coated; 218 LF steel HP14X102 production pile; 448 SY protective coating for reinforced concrete surfaces (penetrating sealers, bridge superstructure); 689 LF Compost filter sock, 12" diameter; 198 CY Placing stockpiled topsoil; 4 EA. Thrie-beam guide rail to PA Type 10M bridge barrier transition without curb; 140 LF 18” Thermoplastic pipe, Group III, 8'-2' fill; 1,507 SY geotextile, Class 4, Type C; 2,065 SY Subbase 6” depth (No. 2A).
Posted Date
Nov 7, 2025
Due Date
Dec 9, 2025
Release: Nov 7, 2025
Township of Elk Creek
Close: Dec 9, 2025
Work includes 49,463 LB reinforcement bars, epoxy coated; 218 LF steel HP14X102 production pile; 448 SY protective coating for reinforced concrete surfaces (penetrating sealers, bridge superstructure); 689 LF Compost filter sock, 12" diameter; 198 CY Placing stockpiled topsoil; 4 EA. Thrie-beam guide rail to PA Type 10M bridge barrier transition without curb; 140 LF 18” Thermoplastic pipe, Group III, 8'-2' fill; 1,507 SY geotextile, Class 4, Type C; 2,065 SY Subbase 6” depth (No. 2A).
AvailableDutchess County
Replacement of county bridge. 1500 CY - Structure excavation; 40 CY - trench and culvert excavation; 85 CY - rock excavation; 560 LF - silt fence; 126 per gallon - duluted tack coat; 144 CY - footing concrete, class HP.
Posted Date
Nov 26, 2025
Due Date
Dec 19, 2025
Release: Nov 26, 2025
Dutchess County
Close: Dec 19, 2025
Replacement of county bridge. 1500 CY - Structure excavation; 40 CY - trench and culvert excavation; 85 CY - rock excavation; 560 LF - silt fence; 126 per gallon - duluted tack coat; 144 CY - footing concrete, class HP.
AvailableTown of Andover
Bridge replacement project.
Posted Date
Nov 25, 2025
Due Date
Dec 23, 2025
Release: Nov 25, 2025
Town of Andover
Close: Dec 23, 2025
Bridge replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →