Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Elk Creek
Work includes 49,463 LB reinforcement bars, epoxy coated; 218 LF steel HP14X102 production pile; 448 SY protective coating for reinforced concrete surfaces (penetrating sealers, bridge superstructure); 689 LF Compost filter sock, 12" diameter; 198 CY Placing stockpiled topsoil; 4 EA. Thrie-beam guide rail to PA Type 10M bridge barrier transition without curb; 140 LF 18” Thermoplastic pipe, Group III, 8'-2' fill; 1,507 SY geotextile, Class 4, Type C; 2,065 SY Subbase 6” depth (No. 2A).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Andover
Bridge replacement project.
Posted Date
Nov 25, 2025
Due Date
Dec 23, 2025
Release: Nov 25, 2025
Town of Andover
Close: Dec 23, 2025
Bridge replacement project.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Monroe County
Wiler road bridge replacement over west creek.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Monroe County
Close: Dec 19, 2025
Wiler road bridge replacement over west creek.
AvailableCounty of Yuba
Provide surveying services for the ellis road bridge replacement project.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
County of Yuba
Close: Dec 16, 2025
Provide surveying services for the ellis road bridge replacement project.
AvailableCity of Columbus
The City of Columbus, Mississippi seeks bids for the demolition and replacement of the Waterworks Road/Tuscaloosa Road bridge over Luxapallila Creek, requiring all labor and materials as specified. The project has a contract time of 365 days with liquidated damages of $500 per day for delays.
Posted Date
-
Due Date
Dec 15, 2025
City of Columbus
Close: Dec 15, 2025
The City of Columbus, Mississippi seeks bids for the demolition and replacement of the Waterworks Road/Tuscaloosa Road bridge over Luxapallila Creek, requiring all labor and materials as specified. The project has a contract time of 365 days with liquidated damages of $500 per day for delays.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →