Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes roadside hardware and utilities includes 0.1 acre clearing, unclassified excavation, 185 CY embedment material, 50 ton aggregate base course grading D-1, 27 ton HMA type II class B, 210 LF CSP 36", 315.5 LF W-beam guardrail, 110 CY riprap class II, painted traffic markings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Exposing and cleaning existing covered drainage grates and previously covered openings, replacement of drainage grates and frames over openings, installation of grated drop inlet frame and grates, shallow drain sumps, injection drywells, asphalt curbs, reflector markers on flexible posts, reinforced concrete pipe, grouted rubble paving, concrete gutters, repaving asphalt pavement, and relocating traffic sign posts.
Posted Date
Dec 5, 2025
Due Date
Jan 5, 2026
Release: Dec 5, 2025
Close: Jan 5, 2026
Exposing and cleaning existing covered drainage grates and previously covered openings, replacement of drainage grates and frames over openings, installation of grated drop inlet frame and grates, shallow drain sumps, injection drywells, asphalt curbs, reflector markers on flexible posts, reinforced concrete pipe, grouted rubble paving, concrete gutters, repaving asphalt pavement, and relocating traffic sign posts.
Premium
Access the largest public sector contact database
HDOT solicits construction bids for Mamalahoa Highway drainage improvements (clean/replace covered drainage grates and frames; install grated drop inlet frames, shallow drain sumps, injection drywells; asphalt curbs; reflector markers; reinforced concrete pipe; grouted rubble paving; concrete gutters; repave asphalt; relocate traffic sign posts). Estimated construction cost $2.5M–$5M. Bidders must register and submit proposals via HIePRO and possess a valid State of Hawaii General Engineering "A" license at time of bidding. A 5% apprenticeship bid adjustment is applicable and at least 80% of the project workforce must be Hawaii residents.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
HDOT solicits construction bids for Mamalahoa Highway drainage improvements (clean/replace covered drainage grates and frames; install grated drop inlet frames, shallow drain sumps, injection drywells; asphalt curbs; reflector markers; reinforced concrete pipe; grouted rubble paving; concrete gutters; repave asphalt; relocate traffic sign posts). Estimated construction cost $2.5M–$5M. Bidders must register and submit proposals via HIePRO and possess a valid State of Hawaii General Engineering "A" license at time of bidding. A 5% apprenticeship bid adjustment is applicable and at least 80% of the project workforce must be Hawaii residents.
AvailableProvide 2" mill and inlay, safety improvements and miscellaneous work that also includes provide basic work zone traffic control according to contract documents and as ordered by the engineer. Perform full/partial depth pavement repairs as indicated in the contract documents and as ordered by the engineer between milepost 76.5 to 86.8. Perform 2" mill and inlay of the asphalt mainline between mp 76.5 and mp 86.8 including u-turns and their deceleration lanes. Installation/replacement of temporary and permanent pavement markings removed by pavement resurfacing. Replacement of miards removed by pavement resurfacing. Repair culvert end section at mp 76.76 and clean and shape ditch at mp 80.25 and mp 81.60. Perform safety improvements as indicated in the contract documents. See attached file.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
Provide 2" mill and inlay, safety improvements and miscellaneous work that also includes provide basic work zone traffic control according to contract documents and as ordered by the engineer. Perform full/partial depth pavement repairs as indicated in the contract documents and as ordered by the engineer between milepost 76.5 to 86.8. Perform 2" mill and inlay of the asphalt mainline between mp 76.5 and mp 86.8 including u-turns and their deceleration lanes. Installation/replacement of temporary and permanent pavement markings removed by pavement resurfacing. Replacement of miards removed by pavement resurfacing. Repair culvert end section at mp 76.76 and clean and shape ditch at mp 80.25 and mp 81.60. Perform safety improvements as indicated in the contract documents. See attached file.
AvailableDrainage improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Drainage improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis