Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Laredo
Cooling Tower Replacement - Municipal Housing.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Alabama Department of Veterans Affairs
Work includes the removal and replacement of adva's existing cooling tower.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Alabama Department of Veterans Affairs
Close: Dec 18, 2025
Work includes the removal and replacement of adva's existing cooling tower.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Wilmette Park District
The scope of work includes removal and disposal of the existing cooling tower, all necessary structural and mechanical prep, installation of the new cooling tower, associated piping, electrical connections, and all required startup and testing.
Posted Date
-
Due Date
Dec 19, 2025
Release: -
Wilmette Park District
Close: Dec 19, 2025
The scope of work includes removal and disposal of the existing cooling tower, all necessary structural and mechanical prep, installation of the new cooling tower, associated piping, electrical connections, and all required startup and testing.
AvailableUniversity Of California Santa Cruz
Works include removal and replacement of the existing cooling tower ct-1, including the heat exchanger, pumps, strainers/filters, piping, valves, controls/ instrumentation, new concrete supports, and related retrofit modifications required to achieve a fully integrated, reliable, energy efficient, and water conserving campus cooling water system.
Posted Date
-
Due Date
Dec 3, 2025
Release: -
University Of California Santa Cruz
Close: Dec 3, 2025
Works include removal and replacement of the existing cooling tower ct-1, including the heat exchanger, pumps, strainers/filters, piping, valves, controls/ instrumentation, new concrete supports, and related retrofit modifications required to achieve a fully integrated, reliable, energy efficient, and water conserving campus cooling water system.
AvailableNew Mexico Tech
Furnish and install replacement media on two BAC 3552A cooling towers.
Posted Date
Nov 17, 2025
Due Date
Dec 4, 2025
Release: Nov 17, 2025
New Mexico Tech
Close: Dec 4, 2025
Furnish and install replacement media on two BAC 3552A cooling towers.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →