Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Alabama Department of Veterans Affairs
Work includes the removal and replacement of adva's existing cooling tower.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Hoover City School District
School cooling tower replacement.
Posted Date
Oct 5, 2025
Due Date
Nov 20, 2025
Release: Oct 5, 2025
Hoover City School District
Close: Nov 20, 2025
School cooling tower replacement.
AvailableUniversity Of California Santa Cruz
Works include removal and replacement of the existing cooling tower ct-1, including the heat exchanger, pumps, strainers/filters, piping, valves, controls/ instrumentation, new concrete supports, and related retrofit modifications required to achieve a fully integrated, reliable, energy efficient, and water conserving campus cooling water system.
Posted Date
-
Due Date
Nov 19, 2025
Release: -
University Of California Santa Cruz
Close: Nov 19, 2025
Works include removal and replacement of the existing cooling tower ct-1, including the heat exchanger, pumps, strainers/filters, piping, valves, controls/ instrumentation, new concrete supports, and related retrofit modifications required to achieve a fully integrated, reliable, energy efficient, and water conserving campus cooling water system.
AvailableCity of Laredo
To remove the existing cooling tower and furnish and install a new evapco at-19-214 (or approved equivalent) including all accessories, piping, electrical components, and structural improvements necessary for complete and reliable operation.
Posted Date
Nov 4, 2025
Due Date
Nov 24, 2025
Release: Nov 4, 2025
City of Laredo
Close: Nov 24, 2025
To remove the existing cooling tower and furnish and install a new evapco at-19-214 (or approved equivalent) including all accessories, piping, electrical components, and structural improvements necessary for complete and reliable operation.
AvailableSalinas Valley Memorial Healthcare District
Work consists of replacement of the existing chiller and cooling tower, includes removal of the existing 70-ton nominal chiller and replacement with a new 80-ton nominal chiller; removal of the existing cooling tower and replacement with a new cooling tower; and removal of existing chilled water and condenser water pumps and replacement with new chilled water and condenser water pumps. Installation shall require seismic anchoring and modification of existing housekeeping pads. The new chiller and cooling tower shall be integrated into the existing siemens building management system (bms). A refrigerant leak detection system shall be design-build by the contractor. All electrical work
Posted Date
Nov 10, 2025
Due Date
Dec 9, 2025
Release: Nov 10, 2025
Salinas Valley Memorial Healthcare District
Close: Dec 9, 2025
Work consists of replacement of the existing chiller and cooling tower, includes removal of the existing 70-ton nominal chiller and replacement with a new 80-ton nominal chiller; removal of the existing cooling tower and replacement with a new cooling tower; and removal of existing chilled water and condenser water pumps and replacement with new chilled water and condenser water pumps. Installation shall require seismic anchoring and modification of existing housekeeping pads. The new chiller and cooling tower shall be integrated into the existing siemens building management system (bms). A refrigerant leak detection system shall be design-build by the contractor. All electrical work
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis