Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Hall County
Work includes approx. 1 LS grading complete, 2,772 SY milling asphalt concrete pavement, 741 SY 4" concrete sidewalk, 1,220 LF 18" pavement reinforced fabric strips, 84 LF retaining wall, 2 EA changeable message sign, 101 TN recycled asphalt concrete patching, 2,881 LF 18" storm drain pipe, 4 EA manhole, 1,832 TN mulch, 5 TN fertilizer mixed grade, 147 LF highway signs, 4 EA thermoplastic pavement marking, 150 LF directional bore, 4 EA 6" gate valve, 65 LF 24" steel casing, 30 LF 6" water main, 3 EA fire hydrant, 3 EA relocate existing water meter and backflow preventer.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
County of El Dorado
To provide project-specific right of way services for the US 50 / ponderosa road interchange - durock road realignment and the US 50 / ponderosa road interchange - north shingle road realignment.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
County of El Dorado
Close: Dec 10, 2025
To provide project-specific right of way services for the US 50 / ponderosa road interchange - durock road realignment and the US 50 / ponderosa road interchange - north shingle road realignment.
AvailableVirginia Department of Transportation
The Virginia Department of Transportation (VDOT) is soliciting bids to construct a Smart Scale road realignment on Route 19 in Russell County, Virginia. The project extends from 0.602 miles west of the intersection with Route 80 to 0.204 miles west of the intersection with Route 80, with bids due on December 17, 2025.
Posted Date
Aug 12, 2025
Due Date
Dec 17, 2025
Release: Aug 12, 2025
Virginia Department of Transportation
Close: Dec 17, 2025
The Virginia Department of Transportation (VDOT) is soliciting bids to construct a Smart Scale road realignment on Route 19 in Russell County, Virginia. The project extends from 0.602 miles west of the intersection with Route 80 to 0.204 miles west of the intersection with Route 80, with bids due on December 17, 2025.
AvailableCity of Covington
Professional construction manager at risk (CMR) services; covington central riverfront (CCR) development infrastructure phase ii.
Posted Date
Oct 8, 2025
Due Date
Nov 18, 2025
Release: Oct 8, 2025
City of Covington
Close: Nov 18, 2025
Professional construction manager at risk (CMR) services; covington central riverfront (CCR) development infrastructure phase ii.
City of Pooler
Provide concept, right of way and construction plans for improvements to quacco road from easthaven/spanton crescent to the i-95 overpass.
Posted Date
Oct 24, 2025
Due Date
Nov 19, 2025
Release: Oct 24, 2025
City of Pooler
Close: Nov 19, 2025
Provide concept, right of way and construction plans for improvements to quacco road from easthaven/spanton crescent to the i-95 overpass.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis