The Virginia Department of Transportation (VDOT) is soliciting bids to construct a Smart Scale road realignment on Route 19 in Russell County, Virginia. The project extends from 0.602 miles west of the intersection with Route 80 to 0.204 miles west of the intersection with Route 80, with bids due on December 17, 2025.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
County of El Dorado
To provide project-specific right of way services for the US 50 / ponderosa road interchange - durock road realignment and the US 50 / ponderosa road interchange - north shingle road realignment.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
County of El Dorado
Close: Dec 10, 2025
To provide project-specific right of way services for the US 50 / ponderosa road interchange - durock road realignment and the US 50 / ponderosa road interchange - north shingle road realignment.
AvailableVirginia Department of Transportation
Work includes: clearing and grubbing, 60 LF of 15" pipe; 110 LF of 15" storm sewer pipe; 142 LF of 18" storm sewer pipe; 215 LF of 24" pipe; 3 EA of 15" end section es-1 or 2; 6 EA of 24" end section es-1 or 2; 1 EA of drop inlet di-7; regular excavation; borrow excavation stormwater management basin fill. See attached file.
Posted Date
Oct 14, 2025
Due Date
Nov 19, 2025
Release: Oct 14, 2025
Virginia Department of Transportation
Close: Nov 19, 2025
Work includes: clearing and grubbing, 60 LF of 15" pipe; 110 LF of 15" storm sewer pipe; 142 LF of 18" storm sewer pipe; 215 LF of 24" pipe; 3 EA of 15" end section es-1 or 2; 6 EA of 24" end section es-1 or 2; 1 EA of drop inlet di-7; regular excavation; borrow excavation stormwater management basin fill. See attached file.
AvailableHall County
Work includes approx. 1 LS grading complete, 2,772 SY milling asphalt concrete pavement, 741 SY 4" concrete sidewalk, 1,220 LF 18" pavement reinforced fabric strips, 84 LF retaining wall, 2 EA changeable message sign, 101 TN recycled asphalt concrete patching, 2,881 LF 18" storm drain pipe, 4 EA manhole, 1,832 TN mulch, 5 TN fertilizer mixed grade, 147 LF highway signs, 4 EA thermoplastic pavement marking, 150 LF directional bore, 4 EA 6" gate valve, 65 LF 24" steel casing, 30 LF 6" water main, 3 EA fire hydrant, 3 EA relocate existing water meter and backflow preventer.
Posted Date
Oct 21, 2025
Due Date
Nov 20, 2025
Release: Oct 21, 2025
Hall County
Close: Nov 20, 2025
Work includes approx. 1 LS grading complete, 2,772 SY milling asphalt concrete pavement, 741 SY 4" concrete sidewalk, 1,220 LF 18" pavement reinforced fabric strips, 84 LF retaining wall, 2 EA changeable message sign, 101 TN recycled asphalt concrete patching, 2,881 LF 18" storm drain pipe, 4 EA manhole, 1,832 TN mulch, 5 TN fertilizer mixed grade, 147 LF highway signs, 4 EA thermoplastic pavement marking, 150 LF directional bore, 4 EA 6" gate valve, 65 LF 24" steel casing, 30 LF 6" water main, 3 EA fire hydrant, 3 EA relocate existing water meter and backflow preventer.
AvailableVirginia Department of Transportation
Work consists of 580 SF, temporary sign; 100 LF, pedestrian barricade device; 1,512 DAY, warning light TY. A; 350 LF, 2 conductor cable; 21,250 LF, 8 conductor cable; 5,300 LF, 8 conductor cable EGC; 6 EA, electrical service work pad; 4,150 LF, bored conduit 3"; 810 LF, trench excavation ECI-1. See attached file and outside link.
Posted Date
Oct 14, 2025
Due Date
Nov 19, 2025
Release: Oct 14, 2025
Virginia Department of Transportation
Close: Nov 19, 2025
Work consists of 580 SF, temporary sign; 100 LF, pedestrian barricade device; 1,512 DAY, warning light TY. A; 350 LF, 2 conductor cable; 21,250 LF, 8 conductor cable; 5,300 LF, 8 conductor cable EGC; 6 EA, electrical service work pad; 4,150 LF, bored conduit 3"; 810 LF, trench excavation ECI-1. See attached file and outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis