Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of multi-story fire training tower(s); construction of live-bum and smoke simulation areas; installation of training props and safety systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of a new live fire training facility. The Fire Rescue live fire training facility shall be a 3 story structure erected from (11) New (One Trip) shipping containers. Due to site constraints and existing septic lines, the overall footprint of the structure will have to be built in an (L) shape to maximize the facilities’ function. The short side of the L shape will consist of (6) containers stacked (3) base, (2) second story, (1) third story and measure 40 feet from end to end. The long side of the L shape will consist of (5) containers, joined perpendicular to the short side, (3) base, (2) second floor, and measure 66 feet from end to end. The interior of the containers will be modified to simulate the interior of a residential structure.
Posted Date
Nov 6, 2025
Due Date
Jan 2, 2026
Release: Nov 6, 2025
Close:
Premium
Access the largest public sector contact database
Construction of a new live fire training facility. The Fire Rescue live fire training facility shall be a 3 story structure erected from (11) New (One Trip) shipping containers. Due to site constraints and existing septic lines, the overall footprint of the structure will have to be built in an (L) shape to maximize the facilities’ function. The short side of the L shape will consist of (6) containers stacked (3) base, (2) second story, (1) third story and measure 40 feet from end to end. The long side of the L shape will consist of (5) containers, joined perpendicular to the short side, (3) base, (2) second floor, and measure 66 feet from end to end. The interior of the containers will be modified to simulate the interior of a residential structure.
AvailableFurnishing and delivery of one (1) multi-function live fire training prop.
Posted Date
Dec 1, 2025
Due Date
Dec 15, 2025
Release: Dec 1, 2025
Close: Dec 15, 2025
Furnishing and delivery of one (1) multi-function live fire training prop.
AvailableConstruction of a live fire training building for the fire and rescue training program. Construction of linear three-story, four-conex box burn building per design drawings. Stairwell leading to 2nd story with vertical access from 2nd floor through 3rd floor roof access via hinged lockable hatch on roof. Exterior and interior steps will have steel cee-channel stringers and grated tread. Incorporate continuous ladder from 2nd floor through 3rd up to roof. All clean up and permitting.
Posted Date
Dec 3, 2025
Due Date
Dec 22, 2025
Release: Dec 3, 2025
Close: Dec 22, 2025
Construction of a live fire training building for the fire and rescue training program. Construction of linear three-story, four-conex box burn building per design drawings. Stairwell leading to 2nd story with vertical access from 2nd floor through 3rd floor roof access via hinged lockable hatch on roof. Exterior and interior steps will have steel cee-channel stringers and grated tread. Incorporate continuous ladder from 2nd floor through 3rd up to roof. All clean up and permitting.
AvailableProvide Fire Training Facility Window Replacement Project.
Posted Date
Dec 20, 2025
Due Date
Jan 8, 2026
Release: Dec 20, 2025
Close: Jan 8, 2026
Provide Fire Training Facility Window Replacement Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis