Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Fernandina Beach seeks a qualified Landscape Contractor for the procurement, delivery, installation, establishment, and one-year maintenance of trees and palms at the Downtown Waterfront Park, including species like Arizona Cypress, Red Cedar, Trident Maple, Green Shadow Sweet Bay Magnolia, Live Oak, and Sabal Palm.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
City of St. Joseph solicits construction bids for 2026 Playground Improvements: supply/installation of playground equipment (climbing tower, Zoom Twist with floor, Stand‑N‑Spin, 4‑bay swing), PIP and engineered wood fiber surfacing, concrete walk with thickened edge (~1,950 sq ft), common excavation (~90 cu yd), and turf establishment (~0.11 ac). Bids are electronic via QuestCDN (contractors must be on plan holders list); digital bid docs $30, electronic bid submission fee $42, 5% bid security required, and bidders must provide MN Statute 16C.285 compliance verification.
Posted Date
Dec 5, 2025
Due Date
Dec 18, 2025
Release: Dec 5, 2025
Close: Dec 18, 2025
City of St. Joseph solicits construction bids for 2026 Playground Improvements: supply/installation of playground equipment (climbing tower, Zoom Twist with floor, Stand‑N‑Spin, 4‑bay swing), PIP and engineered wood fiber surfacing, concrete walk with thickened edge (~1,950 sq ft), common excavation (~90 cu yd), and turf establishment (~0.11 ac). Bids are electronic via QuestCDN (contractors must be on plan holders list); digital bid docs $30, electronic bid submission fee $42, 5% bid security required, and bidders must provide MN Statute 16C.285 compliance verification.
AvailableProvide deepening and widening of the drain, reconstruction of the rock chute, installation of two in-line sheet pile drop structures, and establishment of vegetation.
Posted Date
Nov 18, 2025
Due Date
Dec 15, 2025
Release: Nov 18, 2025
Close: Dec 15, 2025
Provide deepening and widening of the drain, reconstruction of the rock chute, installation of two in-line sheet pile drop structures, and establishment of vegetation.
AvailableProject includes selective demolition, brush clearing, drainage installation, site work for new walls and walkways, segmental block walls, bituminous concrete walkways, precast curbing, memorial garden, and turf establishment.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
Project includes selective demolition, brush clearing, drainage installation, site work for new walls and walkways, segmental block walls, bituminous concrete walkways, precast curbing, memorial garden, and turf establishment.
AvailableWork includes 1 EA project surtax sign, furnish and install; 52.36 AC litter removal, 30 day frequency, 17 total cycles @ 3.08 AC/cycle; 3. 15 AC mowing, 30 day frequency, 17 total cycles @ 1.95 ac/cycle; 1. 19 ac clearing & grubbing; 1 LS landscape complete, large plants-price to include watering during installation & establishment. (see plan sheet 3 for breakdown of items & quantities); 1 LS landscape complete, small plants - price to include watering during installation & establishment (see plan sheet 3 for breakdown of items & quantities); 459 CY organic mulch: 3" depth pine bark nuggets. See outside link.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Close: Dec 18, 2025
Work includes 1 EA project surtax sign, furnish and install; 52.36 AC litter removal, 30 day frequency, 17 total cycles @ 3.08 AC/cycle; 3. 15 AC mowing, 30 day frequency, 17 total cycles @ 1.95 ac/cycle; 1. 19 ac clearing & grubbing; 1 LS landscape complete, large plants-price to include watering during installation & establishment. (see plan sheet 3 for breakdown of items & quantities); 1 LS landscape complete, small plants - price to include watering during installation & establishment (see plan sheet 3 for breakdown of items & quantities); 459 CY organic mulch: 3" depth pine bark nuggets. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis