Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal of existing improvements, construction of a new sidewalk connection, ramps, and handicap raised domes at street intersection, pavement marking, 789 SY 5" concrete sidewalk, 77 SY 7" pavement sidewalk, 45 SY curb landing and ramp, 188 LF barrier curb, 155 SF ladder crossing striping, 40 SF truncated domes, 2 EA type III movable barricades.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of approximately 2,365 feet of 5-foot wide concrete sidewalk, access connections, and culverts in Pierce City, Missouri.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
Construction of approximately 2,365 feet of 5-foot wide concrete sidewalk, access connections, and culverts in Pierce City, Missouri.
AvailablePremium
Access the largest public sector contact database
Work includes 4 SY portland cement concrete driveway pavement, 8 inch; 6,687 SF portland cement concrete sidewalk 5"; 4 SY class c patches, type I, 7"; 21 SY class C patches, type II, 7"; 23 SY class C patches, type III, 7"; 154 SY class C patches, type IV, 7"; 66' storm sewers, class b, type 1 12"; 7' storm sewers, class b, type 1 16"; 10' storm sewers, class B, type 1 24"; 10' storm sewers, class B, type 1 36"; 3 EA. Connection to existing drainage structure; 125' trench drain; 785' combination concrete curb and gutter, type B (special).
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Work includes 4 SY portland cement concrete driveway pavement, 8 inch; 6,687 SF portland cement concrete sidewalk 5"; 4 SY class c patches, type I, 7"; 21 SY class C patches, type II, 7"; 23 SY class C patches, type III, 7"; 154 SY class C patches, type IV, 7"; 66' storm sewers, class b, type 1 12"; 7' storm sewers, class b, type 1 16"; 10' storm sewers, class B, type 1 24"; 10' storm sewers, class B, type 1 36"; 3 EA. Connection to existing drainage structure; 125' trench drain; 785' combination concrete curb and gutter, type B (special).
AvailableWork consists of 4,471 SF of remove and replace 4" PCC sidewalk, 113 SF of remove and replace 6" PCC sidewalk, 48 LF of remove and replace pcc curb and gutter.
Posted Date
Dec 1, 2025
Due Date
Dec 24, 2025
Release: Dec 1, 2025
Close: Dec 24, 2025
Work consists of 4,471 SF of remove and replace 4" PCC sidewalk, 113 SF of remove and replace 6" PCC sidewalk, 48 LF of remove and replace pcc curb and gutter.
AvailableRelease: Dec 2, 2025
Close: Dec 19, 2025
Sidewalk rehabilitation.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis