Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of this project includes surface preparation and coating of tank 2A interior, completing improvements to the interior structural system, and completing various improvements for aeration, baffle, and cathodic protection systems. The contractor shall be completely responsible for the design and construction of the water storage tank modifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide 2026 water treatment plant pump rehabilitation project. The project will include but is not limited to the following major categories of work: full standard rehabilitation for transfer pump no. 3 and high service pump no. 3.
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
Provide 2026 water treatment plant pump rehabilitation project. The project will include but is not limited to the following major categories of work: full standard rehabilitation for transfer pump no. 3 and high service pump no. 3.
AvailableWork consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
Posted Date
Nov 20, 2025
Due Date
Jan 19, 2026
Release: Nov 20, 2025
Close: Jan 19, 2026
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
AvailableThe City of Leesburg, Florida, is seeking proposals for an Elevated Water Tank Rehabilitation Project. This invitation for bids (IFB 250701) was posted on December 1, 2025, with bids due by January 14, 2026.
Posted Date
Dec 1, 2025
Due Date
Jan 14, 2026
Release: Dec 1, 2025
Close: Jan 14, 2026
The City of Leesburg, Florida, is seeking proposals for an Elevated Water Tank Rehabilitation Project. This invitation for bids (IFB 250701) was posted on December 1, 2025, with bids due by January 14, 2026.
AvailableProvide water treatment plant improvements building and storage tank construction.
Posted Date
Dec 12, 2025
Due Date
Jan 8, 2026
Release: Dec 12, 2025
Close: Jan 8, 2026
Provide water treatment plant improvements building and storage tank construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis