Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes demolition and construction of the following building elements: electric, HVAC, windows, drywall, painting, roof, flooring, and hardware installation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Crestmoor Canyon Storm Repair includes removing existing manhole, installing drilling piers, concrete base slab, tie concrete base slab to existing soldier pipes, new precast concrete manhole.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Crestmoor Canyon Storm Repair includes removing existing manhole, installing drilling piers, concrete base slab, tie concrete base slab to existing soldier pipes, new precast concrete manhole.
AvailablePremium
Access the largest public sector contact database
The project includes repair and rectifying damage sustained from recent storm and snow events, ensuring safety and functionality of the facilities, grounds and surrounding areas. This project is essential to improve safety for patients, staff, and visitors by removing hazardous conditions and infrastructure.
Posted Date
Nov 14, 2025
Due Date
Jan 6, 2026
Release: Nov 14, 2025
Close: Jan 6, 2026
The project includes repair and rectifying damage sustained from recent storm and snow events, ensuring safety and functionality of the facilities, grounds and surrounding areas. This project is essential to improve safety for patients, staff, and visitors by removing hazardous conditions and infrastructure.
AvailableThis solicitation is for the Brennaaleen Cedar Detention Pond Project - Phase III to reclaim paving and install new stormwater lines, inlets, manholes, and additional stormwater infrastructure along Cedar Drive to improve drainage for the Cedar Heights and Greenbriar Subdivisions. The City of Edinburg (TX) issued the solicitation with an estimated value range of $500,000 - $1,500,000 and a response deadline of December 23, 2025.
Posted Date
Dec 3, 2025
Due Date
Dec 23, 2025
Release: Dec 3, 2025
Close: Dec 23, 2025
This solicitation is for the Brennaaleen Cedar Detention Pond Project - Phase III to reclaim paving and install new stormwater lines, inlets, manholes, and additional stormwater infrastructure along Cedar Drive to improve drainage for the Cedar Heights and Greenbriar Subdivisions. The City of Edinburg (TX) issued the solicitation with an estimated value range of $500,000 - $1,500,000 and a response deadline of December 23, 2025.
AvailableProvide Rocky Gorge Path Storm Repair.
Posted Date
Jul 25, 2025
Due Date
Aug 1, 2026
Release: Jul 25, 2025
Close: Aug 1, 2026
Provide Rocky Gorge Path Storm Repair.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis