Retrieving RFP details
Release
Close
Illinois Department of Transportation
Work includes 57,162 SY cape seal; 73 SY hot-mix asphalt surface removal - butt joint; 1 LS traffic control and protection, standard 701306; 15 CAL. Da. Changeable message sign; 2,338' short term pavement marking; 779 SF short term pavement marking removal; 53,465' modified urethane pavement marking - line 5"; 294 EA. Raised reflective pavement marker; 40,689 pound bituminous materials (fog seal).
Illinois Department of Transportation
Work includes 70,604 SY cape seal; 160 SY hot-mix asphalt surface removal - butt joint; 15 cal da. Changeable message sign; 7,943' short term pavement marking; 2,648 SF short term pavement marking removal; 57,523' modified urethane pavement marking - line 5"; 333 EA. Raised reflective pavement marker.
Illinois Department of Transportation
Work includes 1,034 SY topsoil furnish and place, 4"; 11,236' longitudinal joint sealant; 728 SY hot-mix asphalt surface removal - butt joint; 53,633 SY hot-mix asphalt surface removal, 3 3/4"; 3 sywelded wire reinforcement; 1,073 SY class D patches, type II, 12"; 135 SY class d patches, type I, 12"; 671 SY class D patches, type IV, 12"; 10,209 sf concrete median surface, 4"; 14,453' shoulder rumble strips, 16"; 22,434' temporary pavement marking - line 4"- paint; 329' temporary pavement marking - line 24"- paint.
Illinois Department of Transportation
Work includes 191 ton hot-mix asphalt binder course (hand method), N70; 17,129 ton hot-mix asphalt binder course, il-9.5 FG, N50; 204,831 SY hot-mix asphalt surface removal, 2 3/4"; 1,390 SY class d patches, type II, 7"; 9 SY class D patches, type II, 15"; 13,201 SY hot-mix asphalt shoulders, 6 1/2"; 855' combination concrete curb and gutter, type M-4. 24; 37.5' steel plate beam guardrail, type a, 6' posts; 99,068' shoulder rumble strips, 8"; 28 cal da. Changeable message sign; 695 SF sign panel - type 1; 310 SF sign panel - type 2.
Release
-
Close
Nov 07, 2025