Retrieving RFP details
Release
Close
North Carolina State Bureau of Investigation
Provide new cellular dialers for existing fire alarm systems. . Includes the furnishing, installation, and connection of new initiation devices, alarm14 appliances, and related items to an existing fire alarm system. The final product shall be a complete coordinated15 system ready for operation. It shall include, but not be limited to, alarm initiating devices, alarm notification16 appliances, auxiliary control devices, annunciators, power supplies, and wiring
SCO-25-29800-02-NTB
North Carolina Department of Public Safety
Work includes fire alarm system conversion.
Randolph Community College
Work includes to replace six fire alarm control panels for six buildings on the main campus.
RPO EAST (36C24E)
The project to replace the fire alarm and mass notification panels shall include the following: The project shall replace the existing EST-3 fire alarm panels and mass notification devices with new fire alarm panels and mass notification devices that are EST-4 or approved equal. Contractor shall replace any fire alarm and mass notification system devices that are not compatible with the EST-4 or approved equal system and make any, and all wiring and conduit changes that are required by switching systems. Contractor shall provide and install a new fiber optic patch panel in Bldg. 17-B and Bldg. 18-B, running a 12-pair single mode fiber optic cable between the two. New fiber optic cable must be installed at a minimum of twelve inches (12) from existing fire alarm fiber optic cable. See attached file.
Release
Oct 29, 2025
Close
Dec 02, 2025