Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The South Carolina Department of Parks, Recreation and Tourism seeks bids to install a Conestoga bathroom kit with associated foundation and utilities at Sesquicentennial State Park in Richland County, SC. The project will be delivered under Design-Bid-Build with an estimated construction cost range of $120,000–$150,000. Bids are due December 18, 2025 (bid opening 2:00 PM local time); documents are available via the agency procurement page referenced from the official SCBO posting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include electrical improvements including, but not limited to, removal of existing pedestals, abandonment of existing conduit, installation of new directional bored conduit and conductors, installation of new pedestals, coordination with utility for replacement of existing service(s), temporary power for pump station, restoration for disturbed areas and other work needed to replace the east campground site electrical.
Posted Date
Oct 10, 2025
Due Date
Dec 17, 2025
Release: Oct 10, 2025
Close: Dec 17, 2025
Premium
Access the largest public sector contact database
Work include electrical improvements including, but not limited to, removal of existing pedestals, abandonment of existing conduit, installation of new directional bored conduit and conductors, installation of new pedestals, coordination with utility for replacement of existing service(s), temporary power for pump station, restoration for disturbed areas and other work needed to replace the east campground site electrical.
Construction of a split-face block comfort station and associated peripheral/site work, including obtaining required permits and approvals.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Construction of a split-face block comfort station and associated peripheral/site work, including obtaining required permits and approvals.
AvailableWork include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
Close: Dec 18, 2025
Work include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
AvailableImprovements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis