Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Portland
Secure professional services from a qualified firm to conduct Part 12 Dam Safety inspections and prepare inspection reports suitable for submittal to and approval by the FERC. Task 1: Project Management, Task 2: Periodic Inspection Development 1, Task 3: Development 1 Additional Inspections and Tasks, Task 5: Development 2 Additional Inspections and Tasks, Task 6: Future Studies.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Texarkana Public Library
Purchase, delivery, and installation of enclosed, noise-reducing study pods ((2) single-occupant pods and (1) four-person pod, or equivalents)
Posted Date
Nov 9, 2025
Due Date
Nov 24, 2025
Release: Nov 9, 2025
Texarkana Public Library
Close: Nov 24, 2025
Purchase, delivery, and installation of enclosed, noise-reducing study pods ((2) single-occupant pods and (1) four-person pod, or equivalents)
AvailableU.S. Army Engineer District Portland
Provide dam oil accountability measures.
Posted Date
Oct 7, 2025
Due Date
Dec 15, 2025
Release: Oct 7, 2025
U.S. Army Engineer District Portland
Close: Dec 15, 2025
Provide dam oil accountability measures.
AvailableCounty of El Dorado
Produce a drainage study for the slate creek watershed and drainage infrastructure in the town in relation to historic flooding. Based upon observed flooding conditions, the portion of slate creek that runs through the town is hydraulically impacted. This drainage study will be split into two (2) phases of work: phase 1, focusing on the overall slate creek watershed, and phase 2, focusing on infrastructure
Posted Date
Aug 1, 2025
Due Date
Nov 21, 2025
Release: Aug 1, 2025
County of El Dorado
Close: Nov 21, 2025
Produce a drainage study for the slate creek watershed and drainage infrastructure in the town in relation to historic flooding. Based upon observed flooding conditions, the portion of slate creek that runs through the town is hydraulically impacted. This drainage study will be split into two (2) phases of work: phase 1, focusing on the overall slate creek watershed, and phase 2, focusing on infrastructure
AvailableTown of Fountain Hills
Providing professional services consisting of "dam sediment removal & maintenance" (the "services"); sediment removal: excavation and proper off-site disposal of accumulated sediment from upstream and downstream storage areas, including all hauling and dust control. ; structural maintenance: cleaning, repair, and/or reconstruction of inlet and outlet control structures, including trash racks, energy dissipators, sluiceways, spillways, and reinforced channels; headwall and culvert repair: repair or reinforcement of damaged concrete headwalls, culverts, wingwalls, and low-flow channels as identified in inspection reports or task orders. See outside link.
Posted Date
Oct 16, 2025
Due Date
Nov 20, 2025
Release: Oct 16, 2025
Town of Fountain Hills
Close: Nov 20, 2025
Providing professional services consisting of "dam sediment removal & maintenance" (the "services"); sediment removal: excavation and proper off-site disposal of accumulated sediment from upstream and downstream storage areas, including all hauling and dust control. ; structural maintenance: cleaning, repair, and/or reconstruction of inlet and outlet control structures, including trash racks, energy dissipators, sluiceways, spillways, and reinforced channels; headwall and culvert repair: repair or reinforcement of damaged concrete headwalls, culverts, wingwalls, and low-flow channels as identified in inspection reports or task orders. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis