Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
U.S. Army Engineer District Portland
Provide dam oil accountability measures.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
U.S. Army Engineer District Portland
Hosting a one-hour virtual industry event at 0900 hours Pacific Standard Time (PST) on 29 January 2026 to provide a project update and to gather industry input as it evaluates project construction risks, industry capabilities, and strategies.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
U.S. Army Engineer District Portland
Close: Dec 12, 2025
Hosting a one-hour virtual industry event at 0900 hours Pacific Standard Time (PST) on 29 January 2026 to provide a project update and to gather industry input as it evaluates project construction risks, industry capabilities, and strategies.
AvailableTown of Fountain Hills
Providing professional services consisting of "dam sediment removal & maintenance" (the "services"); sediment removal: excavation and proper off-site disposal of accumulated sediment from upstream and downstream storage areas, including all hauling and dust control. ; structural maintenance: cleaning, repair, and/or reconstruction of inlet and outlet control structures, including trash racks, energy dissipators, sluiceways, spillways, and reinforced channels; headwall and culvert repair: repair or reinforcement of damaged concrete headwalls, culverts, wingwalls, and low-flow channels as identified in inspection reports or task orders. See outside link.
Posted Date
Oct 16, 2025
Due Date
Nov 20, 2025
Release: Oct 16, 2025
Town of Fountain Hills
Close: Nov 20, 2025
Providing professional services consisting of "dam sediment removal & maintenance" (the "services"); sediment removal: excavation and proper off-site disposal of accumulated sediment from upstream and downstream storage areas, including all hauling and dust control. ; structural maintenance: cleaning, repair, and/or reconstruction of inlet and outlet control structures, including trash racks, energy dissipators, sluiceways, spillways, and reinforced channels; headwall and culvert repair: repair or reinforcement of damaged concrete headwalls, culverts, wingwalls, and low-flow channels as identified in inspection reports or task orders. See outside link.
AvailableBrazos River Authority
The Brazos River Authority is soliciting proposals for professional engineering services to support dam and intake structure projects under an IDIQ contract. Scope includes dam safety inspections, engineering studies, preparation of specifications and drawings, quality control, and updates to facility record drawings.
Posted Date
Oct 30, 2025
Due Date
Dec 9, 2025
Release: Oct 30, 2025
Brazos River Authority
Close: Dec 9, 2025
The Brazos River Authority is soliciting proposals for professional engineering services to support dam and intake structure projects under an IDIQ contract. Scope includes dam safety inspections, engineering studies, preparation of specifications and drawings, quality control, and updates to facility record drawings.
AvailableCity of Columbus
Emergency management consulting firms to provide development and facilitation of a multi-agency table-top exercise and if needed, a functional exercise to examine and validate the o'shaughnessy dam emergency action plan (EAP).
Posted Date
Oct 31, 2025
Due Date
Dec 5, 2025
Release: Oct 31, 2025
City of Columbus
Close: Dec 5, 2025
Emergency management consulting firms to provide development and facilitation of a multi-agency table-top exercise and if needed, a functional exercise to examine and validate the o'shaughnessy dam emergency action plan (EAP).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis