Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of elementary school. The work includes selective demolition, concrete, masonry, doors, aluminum storefront and framing, windows, metal studs and drywall, flooring, ceilings, casework, painting, mechanical, plumbing and associated electrical work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Boiler Replacement At Various Elementary Schools
Posted Date
Nov 29, 2025
Due Date
Dec 16, 2025
Release: Nov 29, 2025
Close: Dec 16, 2025
Boiler Replacement At Various Elementary Schools
AvailablePremium
Access the largest public sector contact database
Provide flooring replacement at 9 elementary schools.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Provide flooring replacement at 9 elementary schools.
AvailableRedevelopment of the 0.58-acre Woodland Spur site.
Posted Date
Nov 18, 2025
Due Date
Jan 12, 2026
Release: Nov 18, 2025
Close: Jan 12, 2026
Redevelopment of the 0.58-acre Woodland Spur site.
AvailableDESIGN/BUILD: Replacing an existing fiber cement panel facade with a combination of prefabricated and field applied exterior insulation finish systems. The work also includes new cantilevered tapered parapet coping and the application of an elastomeric coating over existing portland cement wall finish and accent banding. The demolition includes the removal of existing fiber cement panels, air barrier (TYVEK), 2" and 3" thick foil faced rigid insulation, "Z" shaped furring and tapered parapet coping as required to expose the existing gypsum building sheathing and concrete masonry back up wall construction. The new EIFS systems will be adhered to the existing gypsum building sheathing and concrete masonry back up wall construction.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
DESIGN/BUILD: Replacing an existing fiber cement panel facade with a combination of prefabricated and field applied exterior insulation finish systems. The work also includes new cantilevered tapered parapet coping and the application of an elastomeric coating over existing portland cement wall finish and accent banding. The demolition includes the removal of existing fiber cement panels, air barrier (TYVEK), 2" and 3" thick foil faced rigid insulation, "Z" shaped furring and tapered parapet coping as required to expose the existing gypsum building sheathing and concrete masonry back up wall construction. The new EIFS systems will be adhered to the existing gypsum building sheathing and concrete masonry back up wall construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis