Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
U.S. Army Engineer District Omaha
Ecosystem restoration, element 1 phase 2
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Greater New Haven Regional Water Pollution Control Authority
The proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
Posted Date
Oct 21, 2025
Due Date
Dec 18, 2025
Release: Oct 21, 2025
Greater New Haven Regional Water Pollution Control Authority
Close: Dec 18, 2025
The proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
AvailableU.S. Army Engineer District Chicago
Provide upper des plaines river and tributaries phase II aquatic ecosystem restoration phase II. The project involves restoring approximately 429 acres of historically significant natural communities, including wetlands, prairies, savannas, woodlands, and stream habitats. Major actions include remaindering hastings creek, eradicating invasive plant species, restoring instream habitat, disabling existing agricultural drain tiles, and establishing native plant communities based on site-specific hydrology and topography.
Posted Date
Nov 4, 2025
Due Date
Nov 19, 2025
Release: Nov 4, 2025
U.S. Army Engineer District Chicago
Close: Nov 19, 2025
Provide upper des plaines river and tributaries phase II aquatic ecosystem restoration phase II. The project involves restoring approximately 429 acres of historically significant natural communities, including wetlands, prairies, savannas, woodlands, and stream habitats. Major actions include remaindering hastings creek, eradicating invasive plant species, restoring instream habitat, disabling existing agricultural drain tiles, and establishing native plant communities based on site-specific hydrology and topography.
AvailableU.S. Army Engineer District Mobile
The project entails shoreline improvements along approx. 5 miles of the mainland coast. The work includes construction of a 150'wide beach berm designed to improve coastal resilience and mitigate storm-related impacts. The berm will tie into either the elevation of the adjacent sidewalk along the existing seawall or the surrounding ground surface, whichever is lower, and will extend approx. 150'seaward from the seawall. To complete the berm construction, an estimated 300,000 CY of sand.
Posted Date
Nov 13, 2025
Due Date
Dec 19, 2025
Release: Nov 13, 2025
U.S. Army Engineer District Mobile
Close: Dec 19, 2025
The project entails shoreline improvements along approx. 5 miles of the mainland coast. The work includes construction of a 150'wide beach berm designed to improve coastal resilience and mitigate storm-related impacts. The berm will tie into either the elevation of the adjacent sidewalk along the existing seawall or the surrounding ground surface, whichever is lower, and will extend approx. 150'seaward from the seawall. To complete the berm construction, an estimated 300,000 CY of sand.
AvailableUniversity Of North Carolina At Chapel Hill
The University of North Carolina at Chapel Hill is soliciting construction bids for the Venable Hall Lower Level Upfit project to repurpose approximately 4,300 square feet of former library space into two 30‑40 student classrooms and a shared common area with associated teaching lab fixtures. A pre‑bid meeting is scheduled for December 2, 2025, and bids are due December 20, 2025 at 1:00 pm Eastern.
Posted Date
-
Due Date
Dec 20, 2025
University Of North Carolina At Chapel Hill
Close: Dec 20, 2025
The University of North Carolina at Chapel Hill is soliciting construction bids for the Venable Hall Lower Level Upfit project to repurpose approximately 4,300 square feet of former library space into two 30‑40 student classrooms and a shared common area with associated teaching lab fixtures. A pre‑bid meeting is scheduled for December 2, 2025, and bids are due December 20, 2025 at 1:00 pm Eastern.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis