Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and replacement of existing unit ventilators in rooms 101, 102, 103, 104, and 141 to remove the risk of flooding. This includes relocation of unit ventilators, infill of existing outside air intakes, and replacement of condensing units on the roof.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project includes new construction of an approx. 126,000 SF building to serve as the replacement for the elementary school. Sitework included in this project will include connections & adjustments to site utilities, asphalt paving, curb & gutter and concrete sidewalks.
Posted Date
Oct 31, 2025
Due Date
Dec 16, 2025
Release: Oct 31, 2025
Close: Dec 16, 2025
The project includes new construction of an approx. 126,000 SF building to serve as the replacement for the elementary school. Sitework included in this project will include connections & adjustments to site utilities, asphalt paving, curb & gutter and concrete sidewalks.
Premium
Access the largest public sector contact database
HVAC upgrades at elementary school. The scope of this project includes, but is not limited to, the replacement of steam-based unit ventilators with new UVs equipped with air conditioning through a roof top mounted chiller system; installation of a new packaged RTU and related duct work for the Gym; and upgrades to the existing electrical services.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
HVAC upgrades at elementary school. The scope of this project includes, but is not limited to, the replacement of steam-based unit ventilators with new UVs equipped with air conditioning through a roof top mounted chiller system; installation of a new packaged RTU and related duct work for the Gym; and upgrades to the existing electrical services.
AvailableSeeking proposals from qualified firms to install a new replacement UV Disinfectant System.
Posted Date
Dec 10, 2025
Due Date
Feb 4, 2026
Release: Dec 10, 2025
Close: Feb 4, 2026
Seeking proposals from qualified firms to install a new replacement UV Disinfectant System.
AvailableProject consists of elementary school replacement. See outside link.
Posted Date
-
Due Date
Dec 17, 2025
Release: -
Close: Dec 17, 2025
Project consists of elementary school replacement. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis