Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Weleetka School District 31
Sale of 8 wooden light poles with lights, (used at foot ball field), approx. 60 ft long.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Spokane Transit Authority
Furnish high performance transit (HPT) markers and light poles.
Posted Date
Oct 30, 2025
Due Date
Nov 26, 2025
Release: Oct 30, 2025
Spokane Transit Authority
Close: Nov 26, 2025
Furnish high performance transit (HPT) markers and light poles.
AvailableCity of Bismarck
Provide concrete street light poles. Precast, pre-stressed spun concrete, direct embedded, octagonal, tapered, 13' nominal mounting height. 2 7/8" cast aluminum tenon. Manufacturers and model number: Ameron SEO04SPL. Stresscrete E16β4β-APO-G-S30-AG C/W 140(30/30). Traditional Concrete, Inc. D413-SP-PA-3T. See attached file.
Posted Date
Nov 12, 2025
Due Date
Dec 1, 2025
Release: Nov 12, 2025
City of Bismarck
Close: Dec 1, 2025
Provide concrete street light poles. Precast, pre-stressed spun concrete, direct embedded, octagonal, tapered, 13' nominal mounting height. 2 7/8" cast aluminum tenon. Manufacturers and model number: Ameron SEO04SPL. Stresscrete E16β4β-APO-G-S30-AG C/W 140(30/30). Traditional Concrete, Inc. D413-SP-PA-3T. See attached file.
AvailableNational Guard Bureau (NGB)
Upgrading or replacement of high mast light towers.
Posted Date
-
Due Date
Jan 25, 2026
Release: -
National Guard Bureau (NGB)
Close: Jan 25, 2026
Upgrading or replacement of high mast light towers.
AvailableWashington State Department of Enterprise Services
The project consists of the demolition and replacement of existing site lighting heads with new. New site lighting poles and light fixture heads to be provided. New flagpoles and flagpole light fixtures to be provided. Trenching, backfill, and restoration to be provided for new conduit and wire to new pole and flagpole light fixture locations. Electrical replacement of site lighting heads on existing poles and new light fixture poles and heads. Includes new flagpoles and flagpole light fixtures. Includes, trenching, backfill, and restoration to provide new conduit and wire to new pole and flagpole light fixture locations.
Posted Date
Nov 6, 2025
Due Date
Dec 11, 2025
Release: Nov 6, 2025
Washington State Department of Enterprise Services
Close: Dec 11, 2025
The project consists of the demolition and replacement of existing site lighting heads with new. New site lighting poles and light fixture heads to be provided. New flagpoles and flagpole light fixtures to be provided. Trenching, backfill, and restoration to be provided for new conduit and wire to new pole and flagpole light fixture locations. Electrical replacement of site lighting heads on existing poles and new light fixture poles and heads. Includes new flagpoles and flagpole light fixtures. Includes, trenching, backfill, and restoration to provide new conduit and wire to new pole and flagpole light fixture locations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis